Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of project acceptance, and discloses a project acceptance device for a whole-process consultant, the project acceptance device comprises a protective shell, a fixing assembly and a beating assembly, the fixing assembly and the beating assembly are both mounted on the protective shell, and through holes are formed in the bottom wall and the top wall of the protective shell in an aligned manner; the fixing assembly comprises a first motor, a first mounting block, a second mounting block, a third mounting block, a fourth mounting block, a first rotating shaft, a first worm, a second worm, a first supporting plate, a second supporting plate, a second rotating shaft, a third rotating shaft, a first fan-shaped turbine, a second fan-shaped turbine, a third fan-shaped turbine, a first connecting rod, a second connecting rod, a third connecting rod, a fourth connecting rod and a fixing plate. The beating assembly comprises a protection cylinder, a mounting frame, a second motor, a disc, a fifth connecting rod, a sliding block, a first lifting rod, a second lifting rod, a first clamping ring, a second clamping ring, a beating block, a sixth connecting rod and a lifting plate. According to the invention, the acceptance efficiency is improved, and the labor amount of manpower and workers is saved.
本发明涉及工程验收技术领域,公开了一种全过程咨询师用工程验收装置,包括保护壳、固定组件和敲打组件,所述固定组件和敲打组件均安装在保护壳上,所述保护壳的底壁上与顶壁上对齐设置有通孔,所述固定组件包括电机一、安装块一、安装块二、安装块三、安装块四、转轴一、蜗杆一、蜗杆二、支撑板一、支撑板二、转轴二、转轴三、扇形涡轮一、扇形涡轮二、扇形涡轮三、连接杆一、连接杆二、连接杆三、连接杆四和固定板;所述敲打组件包括保护筒、安装架、电机二、圆盘、连接杆五、滑块、提升杆一、提升杆二、卡环一、卡环二、敲打块、连接杆六和提升板。本发明中,提高了验收的效率,节省了人工和工作人员的劳动量。
The invention relates to the technical field of project acceptance, and discloses a project acceptance device for a whole-process consultant, the project acceptance device comprises a protective shell, a fixing assembly and a beating assembly, the fixing assembly and the beating assembly are both mounted on the protective shell, and through holes are formed in the bottom wall and the top wall of the protective shell in an aligned manner; the fixing assembly comprises a first motor, a first mounting block, a second mounting block, a third mounting block, a fourth mounting block, a first rotating shaft, a first worm, a second worm, a first supporting plate, a second supporting plate, a second rotating shaft, a third rotating shaft, a first fan-shaped turbine, a second fan-shaped turbine, a third fan-shaped turbine, a first connecting rod, a second connecting rod, a third connecting rod, a fourth connecting rod and a fixing plate. The beating assembly comprises a protection cylinder, a mounting frame, a second motor, a disc, a fifth connecting rod, a sliding block, a first lifting rod, a second lifting rod, a first clamping ring, a second clamping ring, a beating block, a sixth connecting rod and a lifting plate. According to the invention, the acceptance efficiency is improved, and the labor amount of manpower and workers is saved.
本发明涉及工程验收技术领域,公开了一种全过程咨询师用工程验收装置,包括保护壳、固定组件和敲打组件,所述固定组件和敲打组件均安装在保护壳上,所述保护壳的底壁上与顶壁上对齐设置有通孔,所述固定组件包括电机一、安装块一、安装块二、安装块三、安装块四、转轴一、蜗杆一、蜗杆二、支撑板一、支撑板二、转轴二、转轴三、扇形涡轮一、扇形涡轮二、扇形涡轮三、连接杆一、连接杆二、连接杆三、连接杆四和固定板;所述敲打组件包括保护筒、安装架、电机二、圆盘、连接杆五、滑块、提升杆一、提升杆二、卡环一、卡环二、敲打块、连接杆六和提升板。本发明中,提高了验收的效率,节省了人工和工作人员的劳动量。
Engineering acceptance device for whole-process consultant
一种全过程咨询师用工程验收装置
CHEN QI (Autor:in)
27.09.2024
Patent
Elektronische Ressource
Chinesisch
REENGINEERING AN ENGINEERING CONSULTANT
Online Contents | 1997
|British Library Conference Proceedings | 1996
|How To Become A Facilities Engineering Consultant
British Library Conference Proceedings | 1999
|Theater stage engineering -- New field for consultant
Engineering Index Backfile | 1958
|The Consultant Selection and Procurement Process
British Library Conference Proceedings | 2000
|