Temporary hole reinforcing structure in construction and construction method
The invention provides a temporary hole reinforcing structure in construction, at least two side beams are arranged on the periphery of a temporary hole, the two side beams are symmetrically arranged on the two parallel side edges of the temporary hole in parallel, and a plate of the temporary hole and the side beams are of an integrated structure. The invention further discloses a construction method of the temporary hole reinforcing structure strand in construction. Comprising the following steps: 1, reserving temporary hole positioning; 2, designing, rechecking and deepening; 3, a plate of the temporary hole and a boundary beam are arranged for synchronous formwork erecting; 4, the plate provided with the temporary hole and the edge beam are synchronously bound through reinforcing steel bars; 5, plate and boundary beam concrete for arranging the temporary hole is poured synchronously; and 6, the formwork is dismantled, and temporary hole opening and boundary beam reinforcing construction is completed. The temporary hole and the reinforcing boundary beams are constructed at the same time, jacking reinforcement of the frame body after the temporary hole is built is avoided, and the method has the advantages that the construction cost is saved, the field safe and civilized construction image is improved, the construction efficiency is improved, and the field construction progress is accelerated.
本发明提供一种施工中临时洞口加固结构,于临时洞口四周设置边梁,边梁的根数至少为2根,2根边梁平行对称设置于临时洞口相互平行两侧边上,设置临时洞口的板与边梁一体结构。还公开一种施工中临时洞口加固结构股施工方法。包括步骤1预留临时洞口定位;步骤2设计复核深化;步骤3设置临时洞口的板与边梁同步支模;步骤4设置临时洞口的板与边梁同步钢筋绑扎;步骤5同步浇筑设置临时洞口的板与边梁混凝土;步骤6拆除模板,完成临时洞口和边梁加固施工。本发明采用临时洞口和加固边梁同时施工完成,避免了临时洞口建成后的架体回顶加固,具有节约施工成本,提升现场安全文明施工形象,提高施工效率,加快现场施工进度的优势。
Temporary hole reinforcing structure in construction and construction method
The invention provides a temporary hole reinforcing structure in construction, at least two side beams are arranged on the periphery of a temporary hole, the two side beams are symmetrically arranged on the two parallel side edges of the temporary hole in parallel, and a plate of the temporary hole and the side beams are of an integrated structure. The invention further discloses a construction method of the temporary hole reinforcing structure strand in construction. Comprising the following steps: 1, reserving temporary hole positioning; 2, designing, rechecking and deepening; 3, a plate of the temporary hole and a boundary beam are arranged for synchronous formwork erecting; 4, the plate provided with the temporary hole and the edge beam are synchronously bound through reinforcing steel bars; 5, plate and boundary beam concrete for arranging the temporary hole is poured synchronously; and 6, the formwork is dismantled, and temporary hole opening and boundary beam reinforcing construction is completed. The temporary hole and the reinforcing boundary beams are constructed at the same time, jacking reinforcement of the frame body after the temporary hole is built is avoided, and the method has the advantages that the construction cost is saved, the field safe and civilized construction image is improved, the construction efficiency is improved, and the field construction progress is accelerated.
本发明提供一种施工中临时洞口加固结构,于临时洞口四周设置边梁,边梁的根数至少为2根,2根边梁平行对称设置于临时洞口相互平行两侧边上,设置临时洞口的板与边梁一体结构。还公开一种施工中临时洞口加固结构股施工方法。包括步骤1预留临时洞口定位;步骤2设计复核深化;步骤3设置临时洞口的板与边梁同步支模;步骤4设置临时洞口的板与边梁同步钢筋绑扎;步骤5同步浇筑设置临时洞口的板与边梁混凝土;步骤6拆除模板,完成临时洞口和边梁加固施工。本发明采用临时洞口和加固边梁同时施工完成,避免了临时洞口建成后的架体回顶加固,具有节约施工成本,提升现场安全文明施工形象,提高施工效率,加快现场施工进度的优势。
Temporary hole reinforcing structure in construction and construction method
一种施工中临时洞口加固结构及施工方法
WANG XIANG (Autor:in) / FU JIANWU (Autor:in) / HUANG YONG (Autor:in) / LIN JINTING (Autor:in) / ZHANG YIGUI (Autor:in) / ZHANG JUN (Autor:in) / LI YANAN (Autor:in) / LI MINZI (Autor:in) / WANG YING (Autor:in) / CHEN HAO (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Recyclable temporary slope reinforcing device and construction method
Europäisches Patentamt | 2022
|Temporary masonry reinforcing device and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Structure reserved hole cantilever plate reinforcing construction method
Europäisches Patentamt | 2024
|