The invention relates to the technical field of sewage pool construction, in particular to a construction method of an anticorrosive coating in a sewage pool, which comprises the following steps: S1, maintaining and leveling: smearing a layer of plain soil on a cleaned base layer, maintaining for 7 days, mainly aiming at unevenness on the base surface, filling and leveling concave parts, leveling convex parts by using a scraper knife, and keeping the whole base surface flat; curing for about 7 days after completion, and curing for more than 10 days if the air temperature is low; s2, primer treatment: coating a layer of epoxy primer on the cured base layer, and spraying the primer so as to isolate water vapor and enhance the anti-corrosion permeation effect. By arranging the first smearing main body and adding a repairing material into the first smearing main body, gaps and cracks existing on the inner wall of the circular sewage pool can be automatically and quickly repaired, so that gaps and damaged parts cannot appear on the inner wall of the sewage pool, and the service life of the sewage pool can be greatly prolonged.
本发明涉及污水池施工技术领域,具体的说是一种污水池内防腐层施工方法,它包括以下步骤:S1、养护找平:在已清洁完成的基层上抹一层素土养护7天,这一步主要针对基面上的凹凸不平,将其凹陷填平,将其凸起用铲刀铲平,保持整个基面平整,完成后养护7天左右,如果气温较低要养护大于10天;S2、底漆处理:在养护好的基层上先上一层环氧底漆,喷涂底漆可以隔绝水汽,增强防腐渗透效果。本发明通过设置的第一涂抹主体,向第一涂抹主体的内部加入修补料,可以自动快速的实现对圆形污水池内壁上存在的空隙和裂痕进行自动修补处理,使得污水池内壁上不会出现空隙和破损处,可以大大的延长污水池使用的寿命。
The invention relates to the technical field of sewage pool construction, in particular to a construction method of an anticorrosive coating in a sewage pool, which comprises the following steps: S1, maintaining and leveling: smearing a layer of plain soil on a cleaned base layer, maintaining for 7 days, mainly aiming at unevenness on the base surface, filling and leveling concave parts, leveling convex parts by using a scraper knife, and keeping the whole base surface flat; curing for about 7 days after completion, and curing for more than 10 days if the air temperature is low; s2, primer treatment: coating a layer of epoxy primer on the cured base layer, and spraying the primer so as to isolate water vapor and enhance the anti-corrosion permeation effect. By arranging the first smearing main body and adding a repairing material into the first smearing main body, gaps and cracks existing on the inner wall of the circular sewage pool can be automatically and quickly repaired, so that gaps and damaged parts cannot appear on the inner wall of the sewage pool, and the service life of the sewage pool can be greatly prolonged.
本发明涉及污水池施工技术领域,具体的说是一种污水池内防腐层施工方法,它包括以下步骤:S1、养护找平:在已清洁完成的基层上抹一层素土养护7天,这一步主要针对基面上的凹凸不平,将其凹陷填平,将其凸起用铲刀铲平,保持整个基面平整,完成后养护7天左右,如果气温较低要养护大于10天;S2、底漆处理:在养护好的基层上先上一层环氧底漆,喷涂底漆可以隔绝水汽,增强防腐渗透效果。本发明通过设置的第一涂抹主体,向第一涂抹主体的内部加入修补料,可以自动快速的实现对圆形污水池内壁上存在的空隙和裂痕进行自动修补处理,使得污水池内壁上不会出现空隙和破损处,可以大大的延长污水池使用的寿命。
Construction method of anti-corrosion layer in sewage pool
一种污水池内防腐层施工方法
MA NING (Autor:in)
08.10.2024
Patent
Elektronische Ressource
Chinesisch
Construction method of anti-seepage and anti-corrosion rainwater pool
Europäisches Patentamt | 2023
|Anti-corrosion layer construction method and anti-corrosion layer
Europäisches Patentamt | 2021
|Anti-seepage pool structure for sewage treatment plant
Europäisches Patentamt | 2024
|