Iron tower pile foundation deviation rectifying structure and deviation rectifying process thereof
The iron tower pile foundation deviation rectifying structure comprises a pile foundation main body, the pile foundation main body is arranged in the ground, an existing pile is arranged below the pile foundation main body, a positioning assembly is arranged outside the pile foundation main body, an anchoring mechanism is further arranged between the positioning assembly and the ground, and an auxiliary assembly is arranged on the ground. Deviation correcting mechanisms are arranged at the four corners of the lower portion of the pile foundation body, and a horizontal force restraining mechanism is further arranged below the pile foundation body. The positioning assembly and the anchoring assembly are arranged on the peripheral side face of the pile foundation body, so that an auxiliary assembly can be conveniently arranged during deviation correction, deviation correction operation can be conveniently conducted in cooperation with a deviation correction mechanism, it is ensured that deviation or inclination cannot occur in the deviation correction process, meanwhile, reference is provided during deviation correction, deviation correction operation is convenient, and the deviation correction efficiency is improved. According to the technical scheme, stay wire fixing is not needed to be conducted on the iron tower outside, construction is convenient, meanwhile, stability is ensured, the pile body is the movable foundation pile after adjustment, and then leveling operation can be conducted on the pile body when follow-up inclination occurs.
本发明公开了一种铁塔桩基纠偏结构及其纠偏工艺,包括桩基主体,桩基主体设置在地面内部,桩基主体下设有既有桩,桩基主体外部设置有定位组件,定位组件与地面之间还设有锚紧机构,地面上设有辅助组件,桩基主体下四边角设有纠偏机构,桩基主体下还设有水平力约束机构。本发明通过在桩基主体周侧面设有定位组件和锚紧组件,可方便在纠偏设置辅助组件,可方便配合纠偏机构进行纠偏操作,确保在纠偏过程中不会发生偏移或倾斜的情况,同时在纠偏时提供参照,方便进行纠偏操作,无需在外界对铁塔进行拉线固定,方便施工,同时确保稳定,且在调节后将桩体为活动基础桩,进而可在后续发生倾斜等时,还可对其进行调平操作。
Iron tower pile foundation deviation rectifying structure and deviation rectifying process thereof
The iron tower pile foundation deviation rectifying structure comprises a pile foundation main body, the pile foundation main body is arranged in the ground, an existing pile is arranged below the pile foundation main body, a positioning assembly is arranged outside the pile foundation main body, an anchoring mechanism is further arranged between the positioning assembly and the ground, and an auxiliary assembly is arranged on the ground. Deviation correcting mechanisms are arranged at the four corners of the lower portion of the pile foundation body, and a horizontal force restraining mechanism is further arranged below the pile foundation body. The positioning assembly and the anchoring assembly are arranged on the peripheral side face of the pile foundation body, so that an auxiliary assembly can be conveniently arranged during deviation correction, deviation correction operation can be conveniently conducted in cooperation with a deviation correction mechanism, it is ensured that deviation or inclination cannot occur in the deviation correction process, meanwhile, reference is provided during deviation correction, deviation correction operation is convenient, and the deviation correction efficiency is improved. According to the technical scheme, stay wire fixing is not needed to be conducted on the iron tower outside, construction is convenient, meanwhile, stability is ensured, the pile body is the movable foundation pile after adjustment, and then leveling operation can be conducted on the pile body when follow-up inclination occurs.
本发明公开了一种铁塔桩基纠偏结构及其纠偏工艺,包括桩基主体,桩基主体设置在地面内部,桩基主体下设有既有桩,桩基主体外部设置有定位组件,定位组件与地面之间还设有锚紧机构,地面上设有辅助组件,桩基主体下四边角设有纠偏机构,桩基主体下还设有水平力约束机构。本发明通过在桩基主体周侧面设有定位组件和锚紧组件,可方便在纠偏设置辅助组件,可方便配合纠偏机构进行纠偏操作,确保在纠偏过程中不会发生偏移或倾斜的情况,同时在纠偏时提供参照,方便进行纠偏操作,无需在外界对铁塔进行拉线固定,方便施工,同时确保稳定,且在调节后将桩体为活动基础桩,进而可在后续发生倾斜等时,还可对其进行调平操作。
Iron tower pile foundation deviation rectifying structure and deviation rectifying process thereof
一种铁塔桩基纠偏结构及其纠偏工艺
HE CHANGQING (Autor:in) / ZHANG BAOZHONG (Autor:in) / LIU JUNPING (Autor:in) / ZHAO LIANGLIANG (Autor:in) / LI JIXIAN (Autor:in) / XIN HAIJIE (Autor:in) / FAN XUEWEI (Autor:in) / XU JINPENG (Autor:in)
15.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Communication tower foundation deviation rectifying structure
Europäisches Patentamt | 2023
|Soft soil foundation pile deviation rectifying method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Building deviation rectifying structure and deviation rectifying method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|