Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel wire mesh blocking structure for construction by adopting skip-bay method
The invention relates to the technical field of steel wire mesh blocking, and discloses a steel wire mesh blocking structure for skip method construction, which comprises a base plate, a plurality of groups of baffles are spliced and mounted at the top of the side of the base plate, limiting sleeves are fixedly mounted above the back surfaces of the baffles, and limiting seats are fixedly mounted at the positions, opposite to the limiting sleeves, of the top of the base plate; a supporting rod is mounted at the top of the limiting seat in a spliced mode, the supporting rod is sleeved with the limiting sleeve, a limiting rod inserted into the limiting seat is fixedly mounted at the bottom of the supporting rod, the baffle is inserted into a splicing groove in the edge side of the top of the base plate firstly, and then the supporting rod penetrates through the limiting sleeve to enable the bottom end of the supporting rod to be spliced with the limiting seat. Due to the fact that the opposite ends of the locking block and the limiting rod are inclined, the limiting rod can abut against the locking block firstly and move towards the outer side till the limiting rod is inserted in place, and the locking block can be clamped into the locking groove to be locked under the bounce of the reset spring when meeting the locking groove; and therefore, the supporting rod is firmly and quickly mounted on the limiting seat.
本发明涉及钢丝网拦挡技术领域,公开了一种跳仓法施工的钢丝网拦挡结构,包括基板,基板的边侧顶部拼接安装有多组挡板,挡板的背面上方固定安装有限位套,基板的顶部与限位套相对的位置固定安装有限位座,限位座的顶部拼接安装有撑杆,且限位套套设安装在撑杆上,撑杆的底部固定安装有插接进限位座内的限位杆,将挡板先插接进基板顶部边侧的拼槽中,随后将撑杆穿过限位套使其底端与限位座进行拼接,此时撑杆底部的限位杆会插接进限位槽中,由于锁块和限位杆的相对端均为倾斜设计,限位杆会先抵接锁块向外侧移动,直至限位杆插接到位,锁块遇到锁槽便会在复位弹簧的反弹下卡接进锁槽内锁死,从而使得撑杆牢固且快速的安装在限位座上。
Steel wire mesh blocking structure for construction by adopting skip-bay method
The invention relates to the technical field of steel wire mesh blocking, and discloses a steel wire mesh blocking structure for skip method construction, which comprises a base plate, a plurality of groups of baffles are spliced and mounted at the top of the side of the base plate, limiting sleeves are fixedly mounted above the back surfaces of the baffles, and limiting seats are fixedly mounted at the positions, opposite to the limiting sleeves, of the top of the base plate; a supporting rod is mounted at the top of the limiting seat in a spliced mode, the supporting rod is sleeved with the limiting sleeve, a limiting rod inserted into the limiting seat is fixedly mounted at the bottom of the supporting rod, the baffle is inserted into a splicing groove in the edge side of the top of the base plate firstly, and then the supporting rod penetrates through the limiting sleeve to enable the bottom end of the supporting rod to be spliced with the limiting seat. Due to the fact that the opposite ends of the locking block and the limiting rod are inclined, the limiting rod can abut against the locking block firstly and move towards the outer side till the limiting rod is inserted in place, and the locking block can be clamped into the locking groove to be locked under the bounce of the reset spring when meeting the locking groove; and therefore, the supporting rod is firmly and quickly mounted on the limiting seat.
本发明涉及钢丝网拦挡技术领域,公开了一种跳仓法施工的钢丝网拦挡结构,包括基板,基板的边侧顶部拼接安装有多组挡板,挡板的背面上方固定安装有限位套,基板的顶部与限位套相对的位置固定安装有限位座,限位座的顶部拼接安装有撑杆,且限位套套设安装在撑杆上,撑杆的底部固定安装有插接进限位座内的限位杆,将挡板先插接进基板顶部边侧的拼槽中,随后将撑杆穿过限位套使其底端与限位座进行拼接,此时撑杆底部的限位杆会插接进限位槽中,由于锁块和限位杆的相对端均为倾斜设计,限位杆会先抵接锁块向外侧移动,直至限位杆插接到位,锁块遇到锁槽便会在复位弹簧的反弹下卡接进锁槽内锁死,从而使得撑杆牢固且快速的安装在限位座上。
Steel wire mesh blocking structure for construction by adopting skip-bay method
一种跳仓法施工的钢丝网拦挡结构
LIU XINBO (Autor:in) / LI CHANGHUI (Autor:in) / HAN WEI (Autor:in) / JIAO LONG (Autor:in) / ZHAO HONGWU (Autor:in)
15.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of basement high-strength concrete structure by adopting skip-bay method
Europäisches Patentamt | 2024
|Construction method of steel wire mesh of steel structure roof
Europäisches Patentamt | 2020
|Blocking structure adopting geomembrane horizontal seepage prevention and construction method
Europäisches Patentamt | 2020
|Method for reserving construction joint of basement bottom plate by adopting skip bay method
Europäisches Patentamt | 2022
|