Construction method of slurry leakage prevention integrated straining beam formwork
The invention provides a construction method of a slurry leakage prevention integrated straining beam formwork. The construction method comprises the steps that a first formwork assembly is hoisted to a first target pier column, the first formwork assembly comprises a first arc formwork and a first connecting formwork which are connected, and the first arc formwork is arranged on the periphery of one side of the first target pier column in a surrounding mode; a second formwork assembly is hoisted to the first target pier column, the second formwork assembly comprises a second arc formwork and a second connecting formwork which are connected, and the second arc formwork is arranged on the periphery of the other side of the first target pier column in a surrounding mode; detachably connecting the end part of the first arc template with the end part of the second arc template; the first connecting formwork and the second connecting formwork are attached; the anti-slurry-leakage integrated straining beam formwork is tightly attached to the first target pier column, and therefore after a straining beam is poured, the phenomena of slurry leakage or voids and pitted surfaces and the like cannot occur at the bottom of the straining beam.
本申请提供了一种防漏浆一体化系梁模板的施工方法。该施工方法包括:将第一模板组件吊装至第一目标墩柱处,第一模板组件包括相连接的第一圆弧模板和第一连接模板,将第一圆弧模板围设于第一目标墩柱一侧的外周;将第二模板组件吊装至第一目标墩柱处,第二模板组件包括相连接的第二圆弧模板和第二连接模板,将第二圆弧模板围设于第一目标墩柱另一侧的外周;接着将第一圆弧模板的端部与第二圆弧模板的端部可拆卸连接;将第一连接模板和第二连接模板贴合;使得防漏浆一体化系梁模板与第一目标墩柱之间紧密贴合,从而系梁浇筑完成后,底部不会出现漏浆或蜂窝麻面等现象。
Construction method of slurry leakage prevention integrated straining beam formwork
The invention provides a construction method of a slurry leakage prevention integrated straining beam formwork. The construction method comprises the steps that a first formwork assembly is hoisted to a first target pier column, the first formwork assembly comprises a first arc formwork and a first connecting formwork which are connected, and the first arc formwork is arranged on the periphery of one side of the first target pier column in a surrounding mode; a second formwork assembly is hoisted to the first target pier column, the second formwork assembly comprises a second arc formwork and a second connecting formwork which are connected, and the second arc formwork is arranged on the periphery of the other side of the first target pier column in a surrounding mode; detachably connecting the end part of the first arc template with the end part of the second arc template; the first connecting formwork and the second connecting formwork are attached; the anti-slurry-leakage integrated straining beam formwork is tightly attached to the first target pier column, and therefore after a straining beam is poured, the phenomena of slurry leakage or voids and pitted surfaces and the like cannot occur at the bottom of the straining beam.
本申请提供了一种防漏浆一体化系梁模板的施工方法。该施工方法包括:将第一模板组件吊装至第一目标墩柱处,第一模板组件包括相连接的第一圆弧模板和第一连接模板,将第一圆弧模板围设于第一目标墩柱一侧的外周;将第二模板组件吊装至第一目标墩柱处,第二模板组件包括相连接的第二圆弧模板和第二连接模板,将第二圆弧模板围设于第一目标墩柱另一侧的外周;接着将第一圆弧模板的端部与第二圆弧模板的端部可拆卸连接;将第一连接模板和第二连接模板贴合;使得防漏浆一体化系梁模板与第一目标墩柱之间紧密贴合,从而系梁浇筑完成后,底部不会出现漏浆或蜂窝麻面等现象。
Construction method of slurry leakage prevention integrated straining beam formwork
防漏浆一体化系梁模板的施工方法
SU YING (Autor:in) / SUN XIAOFEI (Autor:in) / ZHANG PEI (Autor:in) / JIANG TIANXIANG (Autor:in) / YIN ZHENGXING (Autor:in) / LIU JIALIN (Autor:in)
18.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Slurry leakage prevention device and method for concrete formwork
Europäisches Patentamt | 2024
|Aluminum formwork wall corner slurry leakage prevention mechanism
Europäisches Patentamt | 2020
|Aluminum formwork bottom slurry leakage prevention inserting piece and construction method thereof
Europäisches Patentamt | 2023
|