Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel bridge deck assembly type operation platform construction method
The invention provides a steel bridge deck fabricated operation platform construction method, which relates to the technical field of steel bridge deck construction, and comprises the steps of mounting a hanging support, mounting handrails and skirting boards, hoisting longitudinal and transverse main beams of a steel bridge, mounting a steel bridge deck, dismounting the hanging support and the like. The problems that a landing operation platform cannot be erected under the steel bridge deck slab, and the bridge deck slab splicing operation is high in risk and difficulty can be solved.
本发明提供一种钢桥面板装配式作业平台施工方法,涉及钢桥面板施工技术领域,包括安装吊挂支撑、安装栏杆和踢脚板、吊装钢桥纵横主梁、安装钢桥面板、拆除吊挂支撑等步骤。本发明能够决钢桥面板正下方无法搭设落地作业平台,桥面板拼装作业风险高难度大的问题。
Steel bridge deck assembly type operation platform construction method
The invention provides a steel bridge deck fabricated operation platform construction method, which relates to the technical field of steel bridge deck construction, and comprises the steps of mounting a hanging support, mounting handrails and skirting boards, hoisting longitudinal and transverse main beams of a steel bridge, mounting a steel bridge deck, dismounting the hanging support and the like. The problems that a landing operation platform cannot be erected under the steel bridge deck slab, and the bridge deck slab splicing operation is high in risk and difficulty can be solved.
本发明提供一种钢桥面板装配式作业平台施工方法,涉及钢桥面板施工技术领域,包括安装吊挂支撑、安装栏杆和踢脚板、吊装钢桥纵横主梁、安装钢桥面板、拆除吊挂支撑等步骤。本发明能够决钢桥面板正下方无法搭设落地作业平台,桥面板拼装作业风险高难度大的问题。
Steel bridge deck assembly type operation platform construction method
一种钢桥面板装配式作业平台施工方法
CHANG CHENG (Autor:in) / HUANG FENG (Autor:in) / ZENG BICONG (Autor:in) / PENG XIANSHAN (Autor:in) / ZHANG JINBEI (Autor:in) / WANG XIAOJING (Autor:in) / ZHANG XUGUANG (Autor:in) / WEI DI (Autor:in) / WEI QI (Autor:in) / YUAN HAO (Autor:in)
18.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Movable safe operation platform device for large-span steel bridge deck construction
Europäisches Patentamt | 2021
|CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Europäisches Patentamt | 2018
|Steel box girder assembly type bridge deck pavement intelligent construction structure and method
Europäisches Patentamt | 2024
|Prefabricated assembly type bridge deck structure and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|