Casting process for tower drum foundation of wind turbine generator
The invention discloses a pouring process of a wind turbine generator tower drum foundation. The pouring process comprises the pouring process that an operator stands on reinforcing steel bars of the wind turbine generator tower drum foundation and holds a control and management tool by hand to conduct ordered pouring on a concrete conveying pipe. The concrete conveying pipe extrudes the pressing plate when the shaking inertia of the concrete conveying pipe is large, the pressing plate presses the spring to generate elastic deformation to extrude the inner side wall of the clamping groove piece, the concrete conveying pipe is separated from a clamping opening of the clamping groove piece, and the concrete conveying pipe can be automatically separated from the control and management tool without shaking with operators when the shaking inertia of the concrete conveying pipe is large. The problems that a closed-loop through hole is formed in the middle of a second fixing ring, and when the shaking inertia of the concrete conveying pipe is large, operators are likely to shake, and potential safety hazards occur are solved.
本发明公开了一种风电机组塔筒基础的浇注工艺,包括:作业人员站在风电机组塔筒基础钢筋上手持控管工装对混凝土输送管进行有序浇筑的浇注过程。在混凝土输送管晃动惯性较大时对压板挤压,压板压着弹簧发生弹性变形向卡槽件内侧壁挤压,混凝土输送管从卡槽件卡口处脱离,实现混凝土输送管在晃动惯性较大时能自动脱离控管工装而不会带着作业人员晃动,解决了第二固定环中部为闭环通孔,在混凝土输送管晃动惯性较大时容易带着作业人员晃动而出现安全隐患的问题。
Casting process for tower drum foundation of wind turbine generator
The invention discloses a pouring process of a wind turbine generator tower drum foundation. The pouring process comprises the pouring process that an operator stands on reinforcing steel bars of the wind turbine generator tower drum foundation and holds a control and management tool by hand to conduct ordered pouring on a concrete conveying pipe. The concrete conveying pipe extrudes the pressing plate when the shaking inertia of the concrete conveying pipe is large, the pressing plate presses the spring to generate elastic deformation to extrude the inner side wall of the clamping groove piece, the concrete conveying pipe is separated from a clamping opening of the clamping groove piece, and the concrete conveying pipe can be automatically separated from the control and management tool without shaking with operators when the shaking inertia of the concrete conveying pipe is large. The problems that a closed-loop through hole is formed in the middle of a second fixing ring, and when the shaking inertia of the concrete conveying pipe is large, operators are likely to shake, and potential safety hazards occur are solved.
本发明公开了一种风电机组塔筒基础的浇注工艺,包括:作业人员站在风电机组塔筒基础钢筋上手持控管工装对混凝土输送管进行有序浇筑的浇注过程。在混凝土输送管晃动惯性较大时对压板挤压,压板压着弹簧发生弹性变形向卡槽件内侧壁挤压,混凝土输送管从卡槽件卡口处脱离,实现混凝土输送管在晃动惯性较大时能自动脱离控管工装而不会带着作业人员晃动,解决了第二固定环中部为闭环通孔,在混凝土输送管晃动惯性较大时容易带着作业人员晃动而出现安全隐患的问题。
Casting process for tower drum foundation of wind turbine generator
一种风电机组塔筒基础的浇注工艺
JIANG FEI (Autor:in) / CHEN JIANDONG (Autor:in) / LUO JIE (Autor:in) / XU YONG (Autor:in) / GAO MAOXIN (Autor:in) / LU ZHI (Autor:in) / TAN WENHAO (Autor:in) / WEI YUDONG (Autor:in)
18.10.2024
Patent
Elektronische Ressource
Chinesisch
Wind turbine generator tower drum door structure and wind turbine generator tower drum
Europäisches Patentamt | 2021
|Construction platform device for wind turbine generator tower drum
Europäisches Patentamt | 2024
|Door shaft of tower drum door of wind turbine generator
Europäisches Patentamt | 2022
|