Pile foundation detection method
A pile foundation detection method comprises the following steps that at the construction stage, at least three sounding pipes which are evenly distributed relative to the center of a pile foundation are embedded in the side portion of the pile foundation; in the detection stage, an ultrasonic transmitter is arranged at the top of the pile foundation, sound wave receivers are arranged in other sound detection pipes, and a first group of test data is obtained through testing; secondly, an ultrasonic transmitter is arranged in one sounding pipe, sound wave receivers are arranged in the other sounding pipes, the ultrasonic transmitter is arranged at the top end, the sound wave receivers in the other sounding pipes act from top to bottom, and a second set of test data is obtained; and cross-analyzing the first group of test data and the second group of test data to obtain a detection result. The ultrasonic transmitter is arranged at the top of the pile foundation and the ultrasonic transmitter is arranged in the sounding pipe, so that the test data capable of being subjected to cross comparison can be obtained, enough test data can be obtained at a time, and the quality of the pile foundation can be quickly detected.
一种桩基检测方法,包括如下步骤:在建设阶段,在桩基的侧部预埋设置不少于三个相对于桩基的中心均布设置的声测管;在检测阶段,在桩基的顶部设置超声波发射器,其他声测管内设置声波接收器,进行测试得到第一组测试数据;然后在一个声测管内设置超声波发射器,其他声测管内设置声波接收器,首先将超声波发生器置于顶端,其他声测管内的声波接收器进行从上向下的动作,得到第二组测试数据;交叉分析第一组测试数据和第二组测试数据得到检测结果。本申请通过将桩基顶部布置超声波发射器以及在声测管内设置超声波发射器的两种方式得到可以进行交叉对比的测试数据,能够一次性获取足够的测试数据,从而可以快速的完成桩基质量的检测。
Pile foundation detection method
A pile foundation detection method comprises the following steps that at the construction stage, at least three sounding pipes which are evenly distributed relative to the center of a pile foundation are embedded in the side portion of the pile foundation; in the detection stage, an ultrasonic transmitter is arranged at the top of the pile foundation, sound wave receivers are arranged in other sound detection pipes, and a first group of test data is obtained through testing; secondly, an ultrasonic transmitter is arranged in one sounding pipe, sound wave receivers are arranged in the other sounding pipes, the ultrasonic transmitter is arranged at the top end, the sound wave receivers in the other sounding pipes act from top to bottom, and a second set of test data is obtained; and cross-analyzing the first group of test data and the second group of test data to obtain a detection result. The ultrasonic transmitter is arranged at the top of the pile foundation and the ultrasonic transmitter is arranged in the sounding pipe, so that the test data capable of being subjected to cross comparison can be obtained, enough test data can be obtained at a time, and the quality of the pile foundation can be quickly detected.
一种桩基检测方法,包括如下步骤:在建设阶段,在桩基的侧部预埋设置不少于三个相对于桩基的中心均布设置的声测管;在检测阶段,在桩基的顶部设置超声波发射器,其他声测管内设置声波接收器,进行测试得到第一组测试数据;然后在一个声测管内设置超声波发射器,其他声测管内设置声波接收器,首先将超声波发生器置于顶端,其他声测管内的声波接收器进行从上向下的动作,得到第二组测试数据;交叉分析第一组测试数据和第二组测试数据得到检测结果。本申请通过将桩基顶部布置超声波发射器以及在声测管内设置超声波发射器的两种方式得到可以进行交叉对比的测试数据,能够一次性获取足够的测试数据,从而可以快速的完成桩基质量的检测。
Pile foundation detection method
一种桩基检测方法
ZHAO ANHUI (Autor:in) / LIU MINRONG (Autor:in) / FANG SHUAISHUAI (Autor:in) / LIU XIANYE (Autor:in) / ZHAO XIANGRAN (Autor:in) / SHIN BYEONG HAK (Autor:in) / TIAN LIANG (Autor:in)
18.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pile foundation detection device for high pile