Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lifting equipment for constructional engineering
The invention discloses hoisting equipment for constructional engineering, and relates to the technical field of hoisting devices. The device comprises a moving seat, the top of the moving seat is slidably connected with a stand column, the top end of the stand column is fixedly connected with a cross beam, a hoisting seat is arranged below the cross beam, and a traction hoisting assembly used for controlling the hoisting seat to ascend and descend is installed on the surface of the cross beam; a placing mechanism used for storing ceramic tiles is placed on the surface of the hoisting seat, a blocking mechanism used for limiting the ceramic tiles is mounted on the surface of the placing mechanism, and a locking assembly used for limiting the placing mechanism is arranged on the surface of the hoisting seat; according to the building material lifting device, the effect of conveniently and rapidly lifting building materials is achieved in the using process, after the building materials are lifted to the target height, the building materials can be conveyed into a building, the materials do not need to be manually pulled into the building, therefore, the distance between the materials and the building is compensated, the one-by-one discharging process can coincide with the lifting process, and the overall lifting time consumption is shortened.
本发明公开了一种建筑工程起吊设备,涉及吊运装置技术领域。本发明包括移动座,所述移动座的顶部滑动连接有立柱,所述立柱的顶端固定连接有横梁,所述横梁的下方设置有吊运座,所述横梁的表面安装有用于控制吊运座升降移动的牵引吊运组件,所述吊运座的表面放置有用于存储瓷砖片的放置机构,所述放置机构的表面安装有用于对瓷砖片进行限位的阻挡机构,所述吊运座的表面设置有用于对放置机构进行限位的锁定组件,在使用中实现了便于对建筑材料进行快速吊运的效果,当吊运至目标高度后,能够输送至楼层内部,无需人工拉动材料进行楼内,从而弥补了材料和楼层的间距,并且逐个卸料的过程可与吊运过程重合,从而缩减了整体吊运耗时。
Lifting equipment for constructional engineering
The invention discloses hoisting equipment for constructional engineering, and relates to the technical field of hoisting devices. The device comprises a moving seat, the top of the moving seat is slidably connected with a stand column, the top end of the stand column is fixedly connected with a cross beam, a hoisting seat is arranged below the cross beam, and a traction hoisting assembly used for controlling the hoisting seat to ascend and descend is installed on the surface of the cross beam; a placing mechanism used for storing ceramic tiles is placed on the surface of the hoisting seat, a blocking mechanism used for limiting the ceramic tiles is mounted on the surface of the placing mechanism, and a locking assembly used for limiting the placing mechanism is arranged on the surface of the hoisting seat; according to the building material lifting device, the effect of conveniently and rapidly lifting building materials is achieved in the using process, after the building materials are lifted to the target height, the building materials can be conveyed into a building, the materials do not need to be manually pulled into the building, therefore, the distance between the materials and the building is compensated, the one-by-one discharging process can coincide with the lifting process, and the overall lifting time consumption is shortened.
本发明公开了一种建筑工程起吊设备,涉及吊运装置技术领域。本发明包括移动座,所述移动座的顶部滑动连接有立柱,所述立柱的顶端固定连接有横梁,所述横梁的下方设置有吊运座,所述横梁的表面安装有用于控制吊运座升降移动的牵引吊运组件,所述吊运座的表面放置有用于存储瓷砖片的放置机构,所述放置机构的表面安装有用于对瓷砖片进行限位的阻挡机构,所述吊运座的表面设置有用于对放置机构进行限位的锁定组件,在使用中实现了便于对建筑材料进行快速吊运的效果,当吊运至目标高度后,能够输送至楼层内部,无需人工拉动材料进行楼内,从而弥补了材料和楼层的间距,并且逐个卸料的过程可与吊运过程重合,从而缩减了整体吊运耗时。
Lifting equipment for constructional engineering
一种建筑工程起吊设备
CHEN HONGWEI (Autor:in) / LIU LIANFENG (Autor:in) / ZHAO XIPU (Autor:in) / FU JUN (Autor:in) / LIU SHUMIN (Autor:in) / ZHOU LIJUN (Autor:in) / GUAN GUOTAO (Autor:in) / FENG QIBAO (Autor:in) / SONG XIAOSHENG (Autor:in) / ZHOU HONGTAO (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Chinesisch
Auxiliary lifting platform for constructional engineering
Europäisches Patentamt | 2024
|Combined lifting device for constructional engineering
Europäisches Patentamt | 2021
|