Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile pulling method for highway anti-collision guardrail pile
The invention discloses a pile pulling method for a road anti-collision guardrail pile, which comprises the following steps of: before pile pulling operation is carried out on the guardrail pile to be pulled, sleeving a soil isolation pipe on the guardrail pile to be pulled, and driving the soil isolation pipe into the ground until the soil isolation pipe is not less than the buried depth of the guardrail pile to be pulled; the to-be-pulled guardrail pile is separated from soil around the to-be-pulled guardrail pile, the stable adhesion and combination state between the to-be-pulled guardrail pile and the soil around the to-be-pulled guardrail pile is broken, then the soil isolation pipe is pulled out, and due to the fact that the gap between the soil isolation pipe and the to-be-pulled guardrail pile is small, friction resistance between the inner pipe face of the soil isolation pipe and the soil is very small; therefore, the pile pulling force needed for pulling out the soil isolation pipe is greatly reduced, pile pulling operation is conducted on the guardrail pile to be pulled after the soil isolation pipe is pulled out, the pulling force needed for pile pulling can be greatly reduced, and the situation that the guardrail pile to be pulled is snapped is prevented. The device is particularly suitable for pile pulling maintenance operation of old guardrail piles which reach the service life and need to be replaced.
本发明公开了一种公路防撞护栏桩的拔桩方法,在对待拔护栏桩进行拔桩作业前,先将土壤隔离管套在待拔护栏桩上、并打入地下至不小于待拔护栏桩埋深的深度,使待拔护栏桩与其周围土壤进行隔离、打破待拔护栏桩与其周围土壤之间的稳固黏连结合状态,再将土壤隔离管拔出,由于土壤隔离管与待拔护栏桩之间的间隙较小,因此土壤隔离管的内管面与土壤之间的摩擦阻力很小,进而使拔出土壤隔离管所需的拔桩力大大减小,拔出土壤隔离管后再对待拔护栏桩进行拔桩作业,可以大大减小拔桩所需要的拉拔力、防止待拔护栏桩被拉断的情况发生,特别适用于对已到达服役年限而需更换的陈旧护栏桩进行拔桩维护保养作业。
Pile pulling method for highway anti-collision guardrail pile
The invention discloses a pile pulling method for a road anti-collision guardrail pile, which comprises the following steps of: before pile pulling operation is carried out on the guardrail pile to be pulled, sleeving a soil isolation pipe on the guardrail pile to be pulled, and driving the soil isolation pipe into the ground until the soil isolation pipe is not less than the buried depth of the guardrail pile to be pulled; the to-be-pulled guardrail pile is separated from soil around the to-be-pulled guardrail pile, the stable adhesion and combination state between the to-be-pulled guardrail pile and the soil around the to-be-pulled guardrail pile is broken, then the soil isolation pipe is pulled out, and due to the fact that the gap between the soil isolation pipe and the to-be-pulled guardrail pile is small, friction resistance between the inner pipe face of the soil isolation pipe and the soil is very small; therefore, the pile pulling force needed for pulling out the soil isolation pipe is greatly reduced, pile pulling operation is conducted on the guardrail pile to be pulled after the soil isolation pipe is pulled out, the pulling force needed for pile pulling can be greatly reduced, and the situation that the guardrail pile to be pulled is snapped is prevented. The device is particularly suitable for pile pulling maintenance operation of old guardrail piles which reach the service life and need to be replaced.
本发明公开了一种公路防撞护栏桩的拔桩方法,在对待拔护栏桩进行拔桩作业前,先将土壤隔离管套在待拔护栏桩上、并打入地下至不小于待拔护栏桩埋深的深度,使待拔护栏桩与其周围土壤进行隔离、打破待拔护栏桩与其周围土壤之间的稳固黏连结合状态,再将土壤隔离管拔出,由于土壤隔离管与待拔护栏桩之间的间隙较小,因此土壤隔离管的内管面与土壤之间的摩擦阻力很小,进而使拔出土壤隔离管所需的拔桩力大大减小,拔出土壤隔离管后再对待拔护栏桩进行拔桩作业,可以大大减小拔桩所需要的拉拔力、防止待拔护栏桩被拉断的情况发生,特别适用于对已到达服役年限而需更换的陈旧护栏桩进行拔桩维护保养作业。
Pile pulling method for highway anti-collision guardrail pile
一种公路防撞护栏桩的拔桩方法
HAN XIANG (Autor:in) / LIU LILI (Autor:in) / ZHANG YUANYUE (Autor:in) / CHEN FENGTENG (Autor:in) / LIU CHENGQIANG (Autor:in) / TIAN JING (Autor:in) / MENG XIN (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Anti-collision guardrail type power supply pile system
Europäisches Patentamt | 2021
|