Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cover plate and mounting method thereof
The invention provides a cover plate and a mounting method thereof, and relates to the technical field of building equipment, the cover plate comprises a frame, a reinforcing rib group and concrete, the reinforcing rib group is arranged in the frame, the concrete is poured in the frame, the frame is provided with a hoisting part, the hoisting part is arranged in the frame, and the upper surface of the concrete is lower than the hoisting part. According to the construction method, the operation process that secondary pouring is needed for an existing building floor equipment hoisting hole can be omitted, construction procedures such as scaffold building are not needed, the cover plate can be directly hoisted to the building floor equipment hoisting hole through hoisting equipment, plugging of the building floor equipment hoisting hole can be completed, extra scaffolds and formwork supporting are not needed, and the construction efficiency is improved. The construction period can be obviously shortened, and the cost related to secondary pouring is reduced. The installation process of the cover plate is simple, the requirements for operation space and environment are low, and the flexibility and safety of construction can be improved.
本发明提供了本发明提供一种盖板及其安装方法,涉及建筑设备的技术领域,包括:框架、加强筋组和混凝土,加强筋组设于框架内,混凝土浇筑于框架内,框架设有吊装部,吊装部设于框架内,混凝土的上表面低于吊装部。本发明可以省去现有建筑楼板设备吊装孔需要二次浇注的作业流程,无需搭建脚手架等建筑工序,可以直接利用吊装设备将盖板吊装至建筑楼板设备吊装孔,即可完成对建筑楼板设备吊装孔的封堵,无需额外的脚手架和模板支持,可显著缩短施工周期,并降低与二次浇筑相关的成本。盖板的安装过程简单,对作业空间和环境的要求较低,可提高施工的灵活性和安全性。
Cover plate and mounting method thereof
The invention provides a cover plate and a mounting method thereof, and relates to the technical field of building equipment, the cover plate comprises a frame, a reinforcing rib group and concrete, the reinforcing rib group is arranged in the frame, the concrete is poured in the frame, the frame is provided with a hoisting part, the hoisting part is arranged in the frame, and the upper surface of the concrete is lower than the hoisting part. According to the construction method, the operation process that secondary pouring is needed for an existing building floor equipment hoisting hole can be omitted, construction procedures such as scaffold building are not needed, the cover plate can be directly hoisted to the building floor equipment hoisting hole through hoisting equipment, plugging of the building floor equipment hoisting hole can be completed, extra scaffolds and formwork supporting are not needed, and the construction efficiency is improved. The construction period can be obviously shortened, and the cost related to secondary pouring is reduced. The installation process of the cover plate is simple, the requirements for operation space and environment are low, and the flexibility and safety of construction can be improved.
本发明提供了本发明提供一种盖板及其安装方法,涉及建筑设备的技术领域,包括:框架、加强筋组和混凝土,加强筋组设于框架内,混凝土浇筑于框架内,框架设有吊装部,吊装部设于框架内,混凝土的上表面低于吊装部。本发明可以省去现有建筑楼板设备吊装孔需要二次浇注的作业流程,无需搭建脚手架等建筑工序,可以直接利用吊装设备将盖板吊装至建筑楼板设备吊装孔,即可完成对建筑楼板设备吊装孔的封堵,无需额外的脚手架和模板支持,可显著缩短施工周期,并降低与二次浇筑相关的成本。盖板的安装过程简单,对作业空间和环境的要求较低,可提高施工的灵活性和安全性。
Cover plate and mounting method thereof
一种盖板及其安装方法
FENG LEI (Autor:in) / ZOU JINLONG (Autor:in) / WANG YE (Autor:in) / WANG JINXU (Autor:in) / YANG JUNHUI (Autor:in) / XIANG PENGYU (Autor:in) / JIANG YONGQI (Autor:in) / SHI FAYONG (Autor:in) / WANG JUN (Autor:in) / HE YONGDONG (Autor:in)
25.10.2024
Patent
Elektronische Ressource
Chinesisch
Basalt cover plate for railway tunnel and mounting method thereof
Europäisches Patentamt | 2023
|Novel drainage chute cover plate mounting device and using method thereof
Europäisches Patentamt | 2015
|Automobile back door hinge decorative cover plate and mounting method thereof
Europäisches Patentamt | 2023
|