Secondary grouting construction method for side wall of vertical rolling mill
The invention relates to the technical field of metallurgical construction, in particular to a secondary grouting construction method for the side wall of a vertical rolling mill. The technological process comprises the steps of rolling mill foundation joint surface secondary scabbling, rolling mill bottom plate installation, adjusting and fixing, base plate driving and solid filling, bottom plate bottom secondary grouting, side wall formwork blocking, side wall secondary grouting, maintenance formwork removal and steel pipe cutting and repairing. The mode of combining stepped grouting and exhaust overflow is adopted, layered grouting is adopted, the segregation phenomenon of grouting materials is avoided, the construction quality is guaranteed, and the side wall grouting layer is in stepped distribution in appearance and attractive in three-dimensional appearance.
本发明涉及冶金施工技术领域,尤其涉及一种立式轧机侧壁二次灌浆施工方法,其工艺流程为:轧机基础接茬面二次凿毛→轧机底板安装→调整固定→垫板打入塞实→底板底部二次灌浆→侧壁模板封堵→侧壁二次灌浆→养生拆模、钢管切割修复。本发明采取阶梯形状灌注和排气溢流相结合的方式,分层浇灌,避免灌浆料离析现象产生,保证施工质量,而且侧壁灌浆层外观阶梯分布,立体观感美观。
Secondary grouting construction method for side wall of vertical rolling mill
The invention relates to the technical field of metallurgical construction, in particular to a secondary grouting construction method for the side wall of a vertical rolling mill. The technological process comprises the steps of rolling mill foundation joint surface secondary scabbling, rolling mill bottom plate installation, adjusting and fixing, base plate driving and solid filling, bottom plate bottom secondary grouting, side wall formwork blocking, side wall secondary grouting, maintenance formwork removal and steel pipe cutting and repairing. The mode of combining stepped grouting and exhaust overflow is adopted, layered grouting is adopted, the segregation phenomenon of grouting materials is avoided, the construction quality is guaranteed, and the side wall grouting layer is in stepped distribution in appearance and attractive in three-dimensional appearance.
本发明涉及冶金施工技术领域,尤其涉及一种立式轧机侧壁二次灌浆施工方法,其工艺流程为:轧机基础接茬面二次凿毛→轧机底板安装→调整固定→垫板打入塞实→底板底部二次灌浆→侧壁模板封堵→侧壁二次灌浆→养生拆模、钢管切割修复。本发明采取阶梯形状灌注和排气溢流相结合的方式,分层浇灌,避免灌浆料离析现象产生,保证施工质量,而且侧壁灌浆层外观阶梯分布,立体观感美观。
Secondary grouting construction method for side wall of vertical rolling mill
立式轧机侧壁二次灌浆施工方法
WANG DAIFA (Autor:in) / ZHANG CHUNYONG (Autor:in) / WANG DONG (Autor:in) / QIN JUAN (Autor:in) / HU MENGKE (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Post-grouting construction method for wall side of ultra-deep fabricated diaphragm wall
Europäisches Patentamt | 2024
|Modularized construction equipment and construction method for vertical rolling mill foundation
Europäisches Patentamt | 2023
|Grouting method for side wall construction joint in cover-excavation top-down method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|