Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slope construction reinforcement treatment device
The invention relates to the technical field of geotechnical engineering, in particular to a slope construction reinforcement treatment device which comprises a U-shaped mounting plate, a connecting mechanism, a driving mechanism, a positioning mechanism and a bending mechanism. Net hanging and bending can be carried out only after the anchor rods are completely fixed to the side slope, and the progressive operation mode enables the operation time to be prolonged. Binding of the reinforcing mesh and inserting of the anchor rods are synchronously conducted, after the anchor rods are inserted, the reinforcing mesh is hoisted and transferred to the position above the anchor rods through the positioning mechanism, and in the process of lowering the reinforcing mesh, after the positioning mechanism makes contact with the slope, meshes at the joint of the reinforcing mesh are automatically aligned with the anchor rods; by means of the multi-procedure synchronous operation mode, the installation efficiency is relatively high, meanwhile, the bending mechanism can bend the anchor rod at the net hanging position after net hanging, and then the working time can be further shortened.
本发明涉及岩土工程技术领域,特别涉及一种边坡施工加固处理装置,包括U形安装板、连接机构、驱动机构、定位机构和折弯机构,当前在通过锚杆加固的方式对边坡进行施工加固过程中,挂网和折弯必须等到锚杆完全固定在边坡上之后才可进行,这种递进式的作业方式会使作业时间增长;本发明中钢筋网的捆扎和锚杆的安插同步进行,在锚杆安插完成之后,利用定位机构将钢筋网吊装移送到锚杆上方,在下放钢筋网的过程中,定位机构与边坡接触后会自动使钢筋网交接处网眼与锚杆对齐,进而使得钢筋网准确安装在锚杆上,这种多工序同步作业的方式安装效率相对较高,同时本发明折弯机构在挂网之后还可对挂网处锚杆进行折弯,进而可以进一步缩短工作时间。
Slope construction reinforcement treatment device
The invention relates to the technical field of geotechnical engineering, in particular to a slope construction reinforcement treatment device which comprises a U-shaped mounting plate, a connecting mechanism, a driving mechanism, a positioning mechanism and a bending mechanism. Net hanging and bending can be carried out only after the anchor rods are completely fixed to the side slope, and the progressive operation mode enables the operation time to be prolonged. Binding of the reinforcing mesh and inserting of the anchor rods are synchronously conducted, after the anchor rods are inserted, the reinforcing mesh is hoisted and transferred to the position above the anchor rods through the positioning mechanism, and in the process of lowering the reinforcing mesh, after the positioning mechanism makes contact with the slope, meshes at the joint of the reinforcing mesh are automatically aligned with the anchor rods; by means of the multi-procedure synchronous operation mode, the installation efficiency is relatively high, meanwhile, the bending mechanism can bend the anchor rod at the net hanging position after net hanging, and then the working time can be further shortened.
本发明涉及岩土工程技术领域,特别涉及一种边坡施工加固处理装置,包括U形安装板、连接机构、驱动机构、定位机构和折弯机构,当前在通过锚杆加固的方式对边坡进行施工加固过程中,挂网和折弯必须等到锚杆完全固定在边坡上之后才可进行,这种递进式的作业方式会使作业时间增长;本发明中钢筋网的捆扎和锚杆的安插同步进行,在锚杆安插完成之后,利用定位机构将钢筋网吊装移送到锚杆上方,在下放钢筋网的过程中,定位机构与边坡接触后会自动使钢筋网交接处网眼与锚杆对齐,进而使得钢筋网准确安装在锚杆上,这种多工序同步作业的方式安装效率相对较高,同时本发明折弯机构在挂网之后还可对挂网处锚杆进行折弯,进而可以进一步缩短工作时间。
Slope construction reinforcement treatment device
一种边坡施工加固处理装置
FU LIANGLIANG (Autor:in) / FU MING (Autor:in) / LI LONG (Autor:in) / ZHAO PENGLEI (Autor:in) / WANG HAOHAO (Autor:in) / WANG SHUAI (Autor:in) / ZHANG SHUKUN (Autor:in) / CHENG WANGKE (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2019
|Slope reinforcement construction method using vegetation soil and slope reinforcement construction
Europäisches Patentamt | 2021
|Water conservancy construction device for slope reinforcement
Europäisches Patentamt | 2024
|