Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of comprehensive pipe gallery
The invention belongs to the technical field of comprehensive pipe gallery construction, and particularly relates to a construction method of a comprehensive pipe gallery. The method comprises the steps that firstly, the short-section pipe gallery is prefabricated and machined in a prefabricating area, and in the prefabricating process, the short-section pipe gallery is poured and formed through a steel reinforcement framework, a plurality of control driving frames and limiting bases by means of a prefabricating formwork; according to the construction method of the comprehensive pipe gallery, the two short-section pipe galleries can be rapidly and effectively connected together through the design that the rapid clamping and locking mechanism is arranged. The quick assembly can greatly shorten the construction time and improve the construction efficiency; the end-to-end connection is realized through the quick clamping and locking mechanism, so that the connection part is compact in structure, and has higher compression resistance and tension resistance. By means of the design, the stability and safety of the pipe gallery in the using process are guaranteed; compared with a traditional manual connection mode, the rapid clamping and locking mechanism reduces the requirement for manual operation, and the labor cost and the working intensity are reduced.
本发明属于综合管廊施工技术领域,尤其是一种综合管廊的施工方法,包括以下步骤;步骤一、先在预制区预制加工短节段管廊,预制中通过钢筋骨架和多个控制驱动框和限位座进行利用预制模版浇筑成型短节段管廊。该综合管廊的施工方法,通过设置快速装夹锁紧机构的设计使得两个短节段管廊能够迅速、有效地连接在一起。这种快速装配能大幅缩短施工时间,提高施工效率;通过快速装夹锁紧机构实现的首尾相连,使得连接处结构紧密,具有较高的抗压和抗拉能力。这种设计保证了管廊在使用过程中的稳定性和安全性;相比传统的手工连接方式,快速装夹锁紧机构减少了人工操作的需要,降低了人力成本和工作强度。
Construction method of comprehensive pipe gallery
The invention belongs to the technical field of comprehensive pipe gallery construction, and particularly relates to a construction method of a comprehensive pipe gallery. The method comprises the steps that firstly, the short-section pipe gallery is prefabricated and machined in a prefabricating area, and in the prefabricating process, the short-section pipe gallery is poured and formed through a steel reinforcement framework, a plurality of control driving frames and limiting bases by means of a prefabricating formwork; according to the construction method of the comprehensive pipe gallery, the two short-section pipe galleries can be rapidly and effectively connected together through the design that the rapid clamping and locking mechanism is arranged. The quick assembly can greatly shorten the construction time and improve the construction efficiency; the end-to-end connection is realized through the quick clamping and locking mechanism, so that the connection part is compact in structure, and has higher compression resistance and tension resistance. By means of the design, the stability and safety of the pipe gallery in the using process are guaranteed; compared with a traditional manual connection mode, the rapid clamping and locking mechanism reduces the requirement for manual operation, and the labor cost and the working intensity are reduced.
本发明属于综合管廊施工技术领域,尤其是一种综合管廊的施工方法,包括以下步骤;步骤一、先在预制区预制加工短节段管廊,预制中通过钢筋骨架和多个控制驱动框和限位座进行利用预制模版浇筑成型短节段管廊。该综合管廊的施工方法,通过设置快速装夹锁紧机构的设计使得两个短节段管廊能够迅速、有效地连接在一起。这种快速装配能大幅缩短施工时间,提高施工效率;通过快速装夹锁紧机构实现的首尾相连,使得连接处结构紧密,具有较高的抗压和抗拉能力。这种设计保证了管廊在使用过程中的稳定性和安全性;相比传统的手工连接方式,快速装夹锁紧机构减少了人工操作的需要,降低了人力成本和工作强度。
Construction method of comprehensive pipe gallery
一种综合管廊的施工方法
MA HUABING (Autor:in) / AI QIXU (Autor:in) / ZHAO WEIYANG (Autor:in) / LIU YABIN (Autor:in) / ZHANG XIAO (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foldable comprehensive pipe gallery pipe joint, comprehensive pipe gallery and construction method
Europäisches Patentamt | 2020
|Construction method of comprehensive pipe gallery and long-section pipe gallery
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|