Porous pile fixing frame and construction deformation control construction method
The invention provides a porous pile fixing frame and a construction deformation control construction method, and belongs to the technical field of ship construction. The problem that deformation is difficult to control in the construction process of a pile fixing frame of a traditional wind power installation ship is solved. According to the technical scheme, the method comprises the following steps that S1, a middle panel is laid; s2, a shear-resistant block side structure is installed; s3, the cover plate is turned over together; s4, a pile leg rack side structure is installed; s5, covering a second plate; s6, after the whole structure is manufactured, welding is conducted; and S7, after welding is completed, three layers of steel sleeves are installed. The method has the beneficial effects that according to the scheme, the deformation control problem existing in the construction process of a pile fixing frame of a traditional wind power installation ship is solved, the construction efficiency and the product quality are improved by optimizing the construction process and accurately controlling welding deformation, and the stability and the operation efficiency of the wind power installation ship are ensured.
本发明提供了一种多孔式固桩架及建造变形控制施工方法,属于船舶建造技术领域。解决了传统风电安装船固桩架建造过程中存在的变形控制难的问题。其技术方案为:包括以下步骤:步骤S1:铺设中面板;步骤S2:安装抗剪块侧结构;步骤S3:盖板一并翻身;步骤S4:安装桩腿齿条侧结构;步骤S5:盖板二;步骤S6:整体结构制作完成后,进行焊接;步骤S7:焊接完成后,安装三层钢套。本发明的有益效果为:本方案解决了传统风电安装船固桩架建造过程中存在的变形控制难题,通过优化施工流程和精确控制焊接变形,提高了建造效率和产品质量,确保了风电安装船的稳定性和作业效率。
Porous pile fixing frame and construction deformation control construction method
The invention provides a porous pile fixing frame and a construction deformation control construction method, and belongs to the technical field of ship construction. The problem that deformation is difficult to control in the construction process of a pile fixing frame of a traditional wind power installation ship is solved. According to the technical scheme, the method comprises the following steps that S1, a middle panel is laid; s2, a shear-resistant block side structure is installed; s3, the cover plate is turned over together; s4, a pile leg rack side structure is installed; s5, covering a second plate; s6, after the whole structure is manufactured, welding is conducted; and S7, after welding is completed, three layers of steel sleeves are installed. The method has the beneficial effects that according to the scheme, the deformation control problem existing in the construction process of a pile fixing frame of a traditional wind power installation ship is solved, the construction efficiency and the product quality are improved by optimizing the construction process and accurately controlling welding deformation, and the stability and the operation efficiency of the wind power installation ship are ensured.
本发明提供了一种多孔式固桩架及建造变形控制施工方法,属于船舶建造技术领域。解决了传统风电安装船固桩架建造过程中存在的变形控制难的问题。其技术方案为:包括以下步骤:步骤S1:铺设中面板;步骤S2:安装抗剪块侧结构;步骤S3:盖板一并翻身;步骤S4:安装桩腿齿条侧结构;步骤S5:盖板二;步骤S6:整体结构制作完成后,进行焊接;步骤S7:焊接完成后,安装三层钢套。本发明的有益效果为:本方案解决了传统风电安装船固桩架建造过程中存在的变形控制难题,通过优化施工流程和精确控制焊接变形,提高了建造效率和产品质量,确保了风电安装船的稳定性和作业效率。
Porous pile fixing frame and construction deformation control construction method
一种多孔式固桩架及建造变形控制施工方法
ZHU FENG (Autor:in) / SHI HAOJIE (Autor:in) / CAO FENGLI (Autor:in) / ZHOU LULIN (Autor:in) / XU ZHIQIANG (Autor:in) / MIAO HAIQIN (Autor:in) / GU GENHONG (Autor:in) / SHEN PENGPENG (Autor:in) / XU FAN (Autor:in) / GAO JITAO (Autor:in)
05.11.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Connecting joint, construction pile frame and installation method of construction pile frame
Europäisches Patentamt | 2023
|