Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction platform and construction method of super high-rise giant frame building
The invention relates to the technical field of giant frame buildings, and provides a construction platform and method for a super high-rise giant frame building, and the construction platform comprises a truss platform system, a hanging frame system, a supporting system and a hydraulic control system; the multiple supporting systems are distributed on the outer side of the steel pipe column. The truss platform system comprises a truss platform and an auxiliary platform; the truss platform is arranged around the giant frame building and is connected with an upper supporting system of the supporting system; the auxiliary platform is connected with the truss platform and surrounds the steel pipe column; and the hanger system is hung below the truss platform system. Synchronous construction of the horizontal structure and the vertical structure of the ultrahigh giant frame is achieved, and the construction efficiency and the construction safety are improved.
本申请涉及巨型框架建筑技术领域,提供了一种超高层巨型框架建筑的施工平台及施工方法,包括:桁架平台系统、挂架系统、支撑系统和液压控制系统;多个支撑系统分布于钢管柱的外侧;桁架平台系统包括桁架平台和辅助平台;桁架平台环绕巨型框架建筑布置,且与支撑系统的上支撑系统连接;辅助平台与桁架平台连接,包围钢管柱;挂架系统下挂于桁架平台系统的下方。本发明实现了超高巨型框架的水平结构与竖向结构的同步施工,提高施工效率和施工安全性。
Construction platform and construction method of super high-rise giant frame building
The invention relates to the technical field of giant frame buildings, and provides a construction platform and method for a super high-rise giant frame building, and the construction platform comprises a truss platform system, a hanging frame system, a supporting system and a hydraulic control system; the multiple supporting systems are distributed on the outer side of the steel pipe column. The truss platform system comprises a truss platform and an auxiliary platform; the truss platform is arranged around the giant frame building and is connected with an upper supporting system of the supporting system; the auxiliary platform is connected with the truss platform and surrounds the steel pipe column; and the hanger system is hung below the truss platform system. Synchronous construction of the horizontal structure and the vertical structure of the ultrahigh giant frame is achieved, and the construction efficiency and the construction safety are improved.
本申请涉及巨型框架建筑技术领域,提供了一种超高层巨型框架建筑的施工平台及施工方法,包括:桁架平台系统、挂架系统、支撑系统和液压控制系统;多个支撑系统分布于钢管柱的外侧;桁架平台系统包括桁架平台和辅助平台;桁架平台环绕巨型框架建筑布置,且与支撑系统的上支撑系统连接;辅助平台与桁架平台连接,包围钢管柱;挂架系统下挂于桁架平台系统的下方。本发明实现了超高巨型框架的水平结构与竖向结构的同步施工,提高施工效率和施工安全性。
Construction platform and construction method of super high-rise giant frame building
超高层巨型框架建筑的施工平台及施工方法
ZHOU ZHONGYU (Autor:in) / DING XINGCHI (Autor:in) / LIU YONGBO (Autor:in) / ZHANG HAORAN (Autor:in) / SHI JUN (Autor:in) / YIN ZHANBIN (Autor:in)
08.11.2024
Patent
Elektronische Ressource
Chinesisch
Blanking platform construction method for super high-rise building construction
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|