Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building construction post-pouring hole template reinforcing structure and construction method thereof
The invention discloses a building construction post-pouring hole formwork reinforcing structure and a construction method thereof.The building construction post-pouring hole formwork reinforcing structure comprises a hollow formwork pipe which is vertically arranged in a post-pouring hole of a floor slab, the middle of the hollow formwork pipe protrudes outwards to form a water stop formwork box, an inner cavity of the water stop formwork box communicates with an inner cavity of the hollow formwork pipe to form a first pouring space, and a formwork is attached to the bottom of the floor slab; a second pouring space is formed among the mold plate, the hollow mold pipe and the inner wall of the post-pouring hole, and a through hole is formed in the mold plate; the hanging rod is movably arranged in the empty mold pipe and the through hole in a penetrating mode, and a supporting piece is detachably installed at the lower end of the hanging rod and is supported on the mold plate; and the counter-force piece is detachably installed at the upper end of the hanging rod, the two supporting rods of the upper hole opening of the post-pouring hole are supported on the counter-force piece, and after the concrete poured in the second pouring space is solidified and the hanging rod is dismantled, the concrete is poured in the first pouring space to be solidified to form the water stop module. The problem that after an existing floor pay-off hole is blocked, the leakage risk is high is solved.
本发明公开了一种建筑施工后浇孔洞模板加固结构及其施工方法,包括:空模管,竖设于楼板的后浇孔洞中,空模管的中部向外凸起形成止水模箱,止水模箱的内腔与空模管的内腔连通形成第一浇筑空间,楼板的底部贴合有模板,模板与空模管、后浇孔洞的内壁之间形成第二浇筑空间,模板开设有穿孔;吊杆,可活动地穿设于空模管和穿孔中,吊杆的下端可拆卸地安装有支撑件,支撑件支撑于模板;反力件,可拆卸地安装于吊杆的上端,后浇孔洞的上孔口的两根支承杆支撑于反力件,在第二浇筑空间内浇筑的混凝土固化并拆除吊杆后,于第一浇筑空间内浇筑混凝土以固结形成止水模块。本发明解决了现有的楼板放线孔洞封堵后渗漏风险较高的问题。
Building construction post-pouring hole template reinforcing structure and construction method thereof
The invention discloses a building construction post-pouring hole formwork reinforcing structure and a construction method thereof.The building construction post-pouring hole formwork reinforcing structure comprises a hollow formwork pipe which is vertically arranged in a post-pouring hole of a floor slab, the middle of the hollow formwork pipe protrudes outwards to form a water stop formwork box, an inner cavity of the water stop formwork box communicates with an inner cavity of the hollow formwork pipe to form a first pouring space, and a formwork is attached to the bottom of the floor slab; a second pouring space is formed among the mold plate, the hollow mold pipe and the inner wall of the post-pouring hole, and a through hole is formed in the mold plate; the hanging rod is movably arranged in the empty mold pipe and the through hole in a penetrating mode, and a supporting piece is detachably installed at the lower end of the hanging rod and is supported on the mold plate; and the counter-force piece is detachably installed at the upper end of the hanging rod, the two supporting rods of the upper hole opening of the post-pouring hole are supported on the counter-force piece, and after the concrete poured in the second pouring space is solidified and the hanging rod is dismantled, the concrete is poured in the first pouring space to be solidified to form the water stop module. The problem that after an existing floor pay-off hole is blocked, the leakage risk is high is solved.
本发明公开了一种建筑施工后浇孔洞模板加固结构及其施工方法,包括:空模管,竖设于楼板的后浇孔洞中,空模管的中部向外凸起形成止水模箱,止水模箱的内腔与空模管的内腔连通形成第一浇筑空间,楼板的底部贴合有模板,模板与空模管、后浇孔洞的内壁之间形成第二浇筑空间,模板开设有穿孔;吊杆,可活动地穿设于空模管和穿孔中,吊杆的下端可拆卸地安装有支撑件,支撑件支撑于模板;反力件,可拆卸地安装于吊杆的上端,后浇孔洞的上孔口的两根支承杆支撑于反力件,在第二浇筑空间内浇筑的混凝土固化并拆除吊杆后,于第一浇筑空间内浇筑混凝土以固结形成止水模块。本发明解决了现有的楼板放线孔洞封堵后渗漏风险较高的问题。
Building construction post-pouring hole template reinforcing structure and construction method thereof
建筑施工后浇孔洞模板加固结构及其施工方法
MU PENGPENG (Autor:in) / ZHANG ZE (Autor:in) / SUN MINGSHAN (Autor:in) / WANG CHEN (Autor:in)
08.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pouring template for building foundation construction
Europäisches Patentamt | 2020
|Pouring frame fixing template structure for building engineering construction
Europäisches Patentamt | 2022
|Raft plate post-cast strip pouring template and construction method thereof
Europäisches Patentamt | 2015
|Fixing template structure of pouring frame for building engineering construction
Europäisches Patentamt | 2022
|Post-pouring support-free construction method for hole
Europäisches Patentamt | 2024
|