Bridge erecting machine bridge dismantling two-piece beam integral translation device and construction method thereof
The invention provides an integral translation device for two pieces of beams during bridge dismantling of a bridge girder erection machine and a construction method of the integral translation device, relates to the technical field of bridge girder erection machines, and solves the problems that when a bridge with two channels is dismantled, normal passing of the other channel cannot be affected when the bridge is dismantled to the center line position, and the construction cost is low. And part of the position space close to the center line is reduced and limited, and construction is affected. Bridge decks are arranged at the tops of the piers, supporting square timbers are connected to the two sides of the bottoms of the bridge decks, a bridge girder erection machine is arranged at the tops of the bridge decks, hoists are connected to the bottoms of the bridge girder erection machine, and slings are arranged at the bottoms of the hoists. By means of the construction method of the device, when bridge decks on a bridge are cut and dismantled in sequence, the portion, close to the center line, of the bridge can be dismantled under the condition that normal traffic of the bridge on the other side of the center line is not affected.
本发明提供了一种架桥机拆桥两片梁整体平移装置及其施工方法,涉及桥梁架桥机技术领域,解决在对有两个通道的大桥进行拆除的时候,在对其中一条通道进行拆除时,拆除到中线位置时因为不能影响另一个通道的正常通行,靠近中线的部分站位空间变小受到限制,影响施工。桥墩顶部设置有桥面板,桥面板底部两侧连接有支撑方木,桥面板顶部设置有架桥机,架桥机的底部连接有起吊器,起吊器底部设置有吊索。通过该装置的施工方法,让桥梁上的桥面板在进行依次切割拆除的时候,靠近中线的部分,不会在因为会影响到中线另一侧桥梁的正常通行情况下,也能够进行拆除工作。
Bridge erecting machine bridge dismantling two-piece beam integral translation device and construction method thereof
The invention provides an integral translation device for two pieces of beams during bridge dismantling of a bridge girder erection machine and a construction method of the integral translation device, relates to the technical field of bridge girder erection machines, and solves the problems that when a bridge with two channels is dismantled, normal passing of the other channel cannot be affected when the bridge is dismantled to the center line position, and the construction cost is low. And part of the position space close to the center line is reduced and limited, and construction is affected. Bridge decks are arranged at the tops of the piers, supporting square timbers are connected to the two sides of the bottoms of the bridge decks, a bridge girder erection machine is arranged at the tops of the bridge decks, hoists are connected to the bottoms of the bridge girder erection machine, and slings are arranged at the bottoms of the hoists. By means of the construction method of the device, when bridge decks on a bridge are cut and dismantled in sequence, the portion, close to the center line, of the bridge can be dismantled under the condition that normal traffic of the bridge on the other side of the center line is not affected.
本发明提供了一种架桥机拆桥两片梁整体平移装置及其施工方法,涉及桥梁架桥机技术领域,解决在对有两个通道的大桥进行拆除的时候,在对其中一条通道进行拆除时,拆除到中线位置时因为不能影响另一个通道的正常通行,靠近中线的部分站位空间变小受到限制,影响施工。桥墩顶部设置有桥面板,桥面板底部两侧连接有支撑方木,桥面板顶部设置有架桥机,架桥机的底部连接有起吊器,起吊器底部设置有吊索。通过该装置的施工方法,让桥梁上的桥面板在进行依次切割拆除的时候,靠近中线的部分,不会在因为会影响到中线另一侧桥梁的正常通行情况下,也能够进行拆除工作。
Bridge erecting machine bridge dismantling two-piece beam integral translation device and construction method thereof
一种架桥机拆桥两片梁整体平移装置及其施工方法
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Multifunctional bridge erecting machine and bridge erecting construction method
Europäisches Patentamt | 2022
|Erecting method and dismantling method of bridge support
Europäisches Patentamt | 2024
|Bridge erecting machine for road and bridge erecting construction
Europäisches Patentamt | 2024
|Bridge erecting machine and method for full-prefabricated bridge erecting construction
Europäisches Patentamt | 2020
|Bridge erecting machine and construction method thereof
Europäisches Patentamt | 2023
|