Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile foundation construction device for high-altitude electric power engineering
The invention relates to the field of pile foundation construction, in particular to a pile foundation construction device for high-altitude electric power engineering, which comprises a bottom ring, first support plates and second support plates are symmetrically and fixedly connected to two sides of the upper end of the bottom ring, and the first support plates are located on one side, far away from the middle of the bottom ring, of the second support plate on the same side. And driving screw rods are rotationally connected between the first supporting plates and the second supporting plates on the same side. According to the auxiliary positioning equipment for pile foundation construction in the high-altitude severe environment, the two positioning plates provided with the multiple balls are arranged, the two positioning plates can form an annular structure and are connected to the same bottom ring through the third supporting plate, when a pile casing is hoisted, the two positioning plates can be combined and arranged on the outer side of the pile casing in a sleeving mode, and therefore the pile casing can be conveniently hoisted; and the balls on the two positioning plates abut against the outer wall of the pile casing, so that the pile casing can be fixed in a vertical state, and the pile casing cannot swing on hoisting equipment even if construction is carried out in a strong wind environment.
本发明涉及桩基施工领域,具体的说是一种用于高海拔电力工程的桩基施工装置,包括底环,所述底环的上端两侧均对称固定连接有第一支撑板和第二支撑板,所述第一支撑板均位于同侧第二支撑板远离底环中部一侧,所述第一支撑板和同侧第二支撑板之间均共同转动连接有驱动螺杆。本发明是一个用于高海拔恶劣环境下桩基施工的辅助定位设备,通过设置两个安装有多个滚珠的定位板,两个定位板可组成一个环形结构,且通过第三支撑板连接在同一个底环上,在吊装护筒时,可将两个定位板组合套在护筒的外侧,而两个定位板上的滚珠均抵在护筒的外壁上,可将护筒固定在垂直状态,即使在大风环境中施工,护筒无法在吊装设备上摆动。
Pile foundation construction device for high-altitude electric power engineering
The invention relates to the field of pile foundation construction, in particular to a pile foundation construction device for high-altitude electric power engineering, which comprises a bottom ring, first support plates and second support plates are symmetrically and fixedly connected to two sides of the upper end of the bottom ring, and the first support plates are located on one side, far away from the middle of the bottom ring, of the second support plate on the same side. And driving screw rods are rotationally connected between the first supporting plates and the second supporting plates on the same side. According to the auxiliary positioning equipment for pile foundation construction in the high-altitude severe environment, the two positioning plates provided with the multiple balls are arranged, the two positioning plates can form an annular structure and are connected to the same bottom ring through the third supporting plate, when a pile casing is hoisted, the two positioning plates can be combined and arranged on the outer side of the pile casing in a sleeving mode, and therefore the pile casing can be conveniently hoisted; and the balls on the two positioning plates abut against the outer wall of the pile casing, so that the pile casing can be fixed in a vertical state, and the pile casing cannot swing on hoisting equipment even if construction is carried out in a strong wind environment.
本发明涉及桩基施工领域,具体的说是一种用于高海拔电力工程的桩基施工装置,包括底环,所述底环的上端两侧均对称固定连接有第一支撑板和第二支撑板,所述第一支撑板均位于同侧第二支撑板远离底环中部一侧,所述第一支撑板和同侧第二支撑板之间均共同转动连接有驱动螺杆。本发明是一个用于高海拔恶劣环境下桩基施工的辅助定位设备,通过设置两个安装有多个滚珠的定位板,两个定位板可组成一个环形结构,且通过第三支撑板连接在同一个底环上,在吊装护筒时,可将两个定位板组合套在护筒的外侧,而两个定位板上的滚珠均抵在护筒的外壁上,可将护筒固定在垂直状态,即使在大风环境中施工,护筒无法在吊装设备上摆动。
Pile foundation construction device for high-altitude electric power engineering
一种用于高海拔电力工程的桩基施工装置
LI QIANG (Autor:in) / ZHANG PENG (Autor:in) / BAEK KWANG-A (Autor:in) / NI XIANGPING (Autor:in) / DU XIAOLEI (Autor:in) / LIU BO (Autor:in) / LI GANG (Autor:in) / LIU YANG (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Electric power engineering pile foundation construction device
Europäisches Patentamt | 2024
|Auxiliary device for electric power engineering pile foundation construction
Europäisches Patentamt | 2024
|High altitude area seasonal construction pile foundation structure
Europäisches Patentamt | 2024
|Foundation engineering composite pile and pile foundation construction method
Europäisches Patentamt | 2023
|Pile foundation construction auxiliary device for foundation engineering
Europäisches Patentamt | 2023
|