Construction process for settlement damage treatment of concrete lining plate
The invention relates to the technical field of concrete lining plates, and discloses a construction process for settlement damage treatment of a concrete lining plate, which comprises the following steps of: 1, expanding the settlement and cracking part of the concrete lining plate by 50 centimeters along the periphery, and snapping lines to divide fixed points; 2, settlement and cracking positions are chiseled away and cleaned up, then high-performance mortar and pebbles are stirred according to the proportion of 1: 1, and then cushion layer pouring is conducted till the designed elevation is reached; step 3, aiming at the crack area, expanding for 3cm along each side of the crack area, cutting the crack area to be wide and deep, chiseling away the crack area, and filling R70 mortar for repairing; then, joint cutting (3-5 mm) is carried out, and polyurethane weather-proof sealant is poured; fourthly, after repairing is completed, R70 mortar is sprayed or scraped on the surface in batches; 5, an electric sprayer is used for spraying a D200 closed coating; and 6, water spraying maintenance is carried out every 12 h for three times, and the geotechnical cloth is covered for maintaining the repair area during the period.
本发明涉及混凝土衬砌板技术领域,且公开了一种混凝土衬砌板沉降破坏处理用施工工艺,包括以下步骤:步骤一、将混凝土衬砌板沉降、开裂处沿周边扩大50公分弹线划分定点;步骤二、凿除沉降、开裂处并清理干净后使用高性能砂浆和石子按1:1配比搅拌后进行垫层浇筑至设计标高;步骤三、针对裂缝区域,沿裂缝区域每边扩大3cm,将其切宽切深,将其凿除后填补R70砂浆进行修复;然后进行切缝(3‑5mm)并灌注聚氨酯耐候胶;步骤四、修复完成后于表面喷涂或者批刮R70砂浆;步骤五、使用电动喷雾器喷涂D200封闭涂层;步骤六、每隔12h进行一次洒水养护共三次、期间覆盖土工布保养修复区域。
Construction process for settlement damage treatment of concrete lining plate
The invention relates to the technical field of concrete lining plates, and discloses a construction process for settlement damage treatment of a concrete lining plate, which comprises the following steps of: 1, expanding the settlement and cracking part of the concrete lining plate by 50 centimeters along the periphery, and snapping lines to divide fixed points; 2, settlement and cracking positions are chiseled away and cleaned up, then high-performance mortar and pebbles are stirred according to the proportion of 1: 1, and then cushion layer pouring is conducted till the designed elevation is reached; step 3, aiming at the crack area, expanding for 3cm along each side of the crack area, cutting the crack area to be wide and deep, chiseling away the crack area, and filling R70 mortar for repairing; then, joint cutting (3-5 mm) is carried out, and polyurethane weather-proof sealant is poured; fourthly, after repairing is completed, R70 mortar is sprayed or scraped on the surface in batches; 5, an electric sprayer is used for spraying a D200 closed coating; and 6, water spraying maintenance is carried out every 12 h for three times, and the geotechnical cloth is covered for maintaining the repair area during the period.
本发明涉及混凝土衬砌板技术领域,且公开了一种混凝土衬砌板沉降破坏处理用施工工艺,包括以下步骤:步骤一、将混凝土衬砌板沉降、开裂处沿周边扩大50公分弹线划分定点;步骤二、凿除沉降、开裂处并清理干净后使用高性能砂浆和石子按1:1配比搅拌后进行垫层浇筑至设计标高;步骤三、针对裂缝区域,沿裂缝区域每边扩大3cm,将其切宽切深,将其凿除后填补R70砂浆进行修复;然后进行切缝(3‑5mm)并灌注聚氨酯耐候胶;步骤四、修复完成后于表面喷涂或者批刮R70砂浆;步骤五、使用电动喷雾器喷涂D200封闭涂层;步骤六、每隔12h进行一次洒水养护共三次、期间覆盖土工布保养修复区域。
Construction process for settlement damage treatment of concrete lining plate
一种混凝土衬砌板沉降破坏处理用施工工艺
LI DIANJI (Autor:in) / ZHOU SHAOFENG (Autor:in) / XIONG QINGRONG (Autor:in) / WEI GUO (Autor:in) / JIANG YONG (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Freeze-thaw damage treatment construction process for concrete lining plate
Europäisches Patentamt | 2024
|TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2023
|