Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated guardrail medial strip side-buried tube bundle grid constraint silicon core tube and construction method
The invention provides a prefabricated guardrail medial strip side-buried tube bundle grid restraining silicon core tube and a construction method. The construction method comprises the following steps of prefabricated guardrail medial strip construction, road surface construction, silicon core tube installation supporting system construction, shaped movable hanging bracket auxiliary installation device construction, silicon core tube construction and silicon core tube encapsulation construction. According to the invention, the stability of the bracket is improved, the problems of rapid fixation and arrangement sequence of the silicon core pipe and high release difficulty caused by the problems of pipeline length, weight and the like are solved, and the bracket can obtain better technical economic and social benefits when being applied to practical engineering.
本发明提供预制护栏中央分隔带侧埋管束格栅约束硅芯管及施工方法,包括以下步骤:预制护栏中央分隔带施工、路面施工、硅芯管安装支撑体系施工、定型化移动吊架辅助安装装置施工、硅芯管施工、硅芯管包封施工;本发明提高了支架的稳定性,解决了硅芯管快速固定和排布顺序问题以及因为管线长度、重量等问题,造成施放难度较高的难题,应用于实际工程中可取得较好的技术经济和社会效益。
Prefabricated guardrail medial strip side-buried tube bundle grid constraint silicon core tube and construction method
The invention provides a prefabricated guardrail medial strip side-buried tube bundle grid restraining silicon core tube and a construction method. The construction method comprises the following steps of prefabricated guardrail medial strip construction, road surface construction, silicon core tube installation supporting system construction, shaped movable hanging bracket auxiliary installation device construction, silicon core tube construction and silicon core tube encapsulation construction. According to the invention, the stability of the bracket is improved, the problems of rapid fixation and arrangement sequence of the silicon core pipe and high release difficulty caused by the problems of pipeline length, weight and the like are solved, and the bracket can obtain better technical economic and social benefits when being applied to practical engineering.
本发明提供预制护栏中央分隔带侧埋管束格栅约束硅芯管及施工方法,包括以下步骤:预制护栏中央分隔带施工、路面施工、硅芯管安装支撑体系施工、定型化移动吊架辅助安装装置施工、硅芯管施工、硅芯管包封施工;本发明提高了支架的稳定性,解决了硅芯管快速固定和排布顺序问题以及因为管线长度、重量等问题,造成施放难度较高的难题,应用于实际工程中可取得较好的技术经济和社会效益。
Prefabricated guardrail medial strip side-buried tube bundle grid constraint silicon core tube and construction method
预制护栏中央分隔带侧埋管束格栅约束硅芯管及施工方法
WANG PAN (Autor:in) / HUANG XIAODAN (Autor:in) / XU FANGTAO (Autor:in) / JIANG KUIMIN (Autor:in) / SHI KAI (Autor:in) / TAN FUXIN (Autor:in) / ZHENG QIANGFEI (Autor:in) / LI CHAO (Autor:in) / YANG CHANGHUEI (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Expressway medial strip portal protective guardrail and construction method thereof
Europäisches Patentamt | 2022
|