Foundation pit line preformed hole structure for civil engineering construction based on transformer substation
The invention relates to the technical field of reserving devices, and discloses a foundation pit line reserved hole structure for civil engineering construction based on a transformer substation, the foundation pit line reserved hole structure comprises a base and an upper frame, the upper surface of the base is rotatably connected with a lower frame, and the two ends of the bottom of the upper frame are fixedly connected with adjusting rods; a plurality of threaded holes are formed in the outer walls of the two adjusting rods, tightening bolts are arranged on the two sides of the lower frame in a penetrating mode, the outer walls of the two tightening bolts are in threaded connection with the inner walls of the threaded holes in the two sides correspondingly, and fixing assemblies are fixedly connected to the two ends of the top of the upper frame correspondingly. The middle of the lower frame and the middle of the upper frame are both fixedly connected with cross rods, and the outer walls of the two cross rods are both slidably connected with a plurality of moving rings. Through the adjustable design of the frame, the device can be suitable for circuit preformed holes under different conditions, and a user is allowed to adjust the size of the frame and the number of structural parts according to specific circuit layout and space requirements.
本发明涉及预留装置技术领域,公开了基于变电站土建工程建设用基坑线路预留孔结构,包括底座和上框架,所述底座的上表面转动连接有下框架,所述上框架的底部两端均固定连接有调节杆,两个所述调节杆的外壁均开设有若干个螺纹孔,所述下框架的两侧均贯设有拧紧螺栓,两个所述拧紧螺栓的外壁分别螺纹连接在两侧螺纹孔的内壁,所述上框架的顶部两端均固定连接有固定组件,所述下框架和上框架的中部均固定连接有横杆,两个所述横杆的外壁均滑动连接有多个移动环。通过对框架的可调节设计,使得该装置能够适应不同情况的线路预留孔使用,允许用户根据具体的线路布局和空间要求来调整框架的大小,以及结构件的数量。
Foundation pit line preformed hole structure for civil engineering construction based on transformer substation
The invention relates to the technical field of reserving devices, and discloses a foundation pit line reserved hole structure for civil engineering construction based on a transformer substation, the foundation pit line reserved hole structure comprises a base and an upper frame, the upper surface of the base is rotatably connected with a lower frame, and the two ends of the bottom of the upper frame are fixedly connected with adjusting rods; a plurality of threaded holes are formed in the outer walls of the two adjusting rods, tightening bolts are arranged on the two sides of the lower frame in a penetrating mode, the outer walls of the two tightening bolts are in threaded connection with the inner walls of the threaded holes in the two sides correspondingly, and fixing assemblies are fixedly connected to the two ends of the top of the upper frame correspondingly. The middle of the lower frame and the middle of the upper frame are both fixedly connected with cross rods, and the outer walls of the two cross rods are both slidably connected with a plurality of moving rings. Through the adjustable design of the frame, the device can be suitable for circuit preformed holes under different conditions, and a user is allowed to adjust the size of the frame and the number of structural parts according to specific circuit layout and space requirements.
本发明涉及预留装置技术领域,公开了基于变电站土建工程建设用基坑线路预留孔结构,包括底座和上框架,所述底座的上表面转动连接有下框架,所述上框架的底部两端均固定连接有调节杆,两个所述调节杆的外壁均开设有若干个螺纹孔,所述下框架的两侧均贯设有拧紧螺栓,两个所述拧紧螺栓的外壁分别螺纹连接在两侧螺纹孔的内壁,所述上框架的顶部两端均固定连接有固定组件,所述下框架和上框架的中部均固定连接有横杆,两个所述横杆的外壁均滑动连接有多个移动环。通过对框架的可调节设计,使得该装置能够适应不同情况的线路预留孔使用,允许用户根据具体的线路布局和空间要求来调整框架的大小,以及结构件的数量。
Foundation pit line preformed hole structure for civil engineering construction based on transformer substation
基于变电站土建工程建设用基坑线路预留孔结构
WANG ZHIQIANG (Autor:in) / WANG YANG (Autor:in) / DUAN ZHENQIU (Autor:in) / FENG YANG (Autor:in) / LIU NAIXIN (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
B65H
HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
,
Handhaben von dünnem oder fadenförmigem Gut, z.B. Folien, Bahnen, Kabeln
/
E02D
FOUNDATIONS
,
Gründungen
Preformed hole template for building civil engineering construction
Europäisches Patentamt | 2021
|Foundation pit supporting device for civil construction of transformer substation
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Civil construction mold device for transformer substation
Europäisches Patentamt | 2024
|