Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sponge city prefabricated permeable pavement construction equipment and construction method
The invention belongs to the field of sponge cities, particularly relates to prefabricated permeable pavement construction equipment and a construction method for a sponge city, and aims to solve the problems that a lot of time needs to be consumed and the working efficiency is greatly reduced due to excessive working procedures of existing permeable pavement construction. The bottom of the equipment body is fixedly connected with four third fixing plates which are symmetrical in pairs, the interiors of the two third fixing plates located on the same side rotationally penetrate through the same first rotating shaft, and the two ends of the first rotating shaft are fixedly connected with moving wheels. And a third rotating shaft drives an eccentric plate to transversely move, a scraper plate scrapes concrete to be flat, a side rod drives two pushing rods to transversely move, a pressing block puns soil below the pressing block under the action of gravity, a sweeping wheel drives bristles to rotate, and then dust on a road is cleaned.
本发明属于海绵城市领域,尤其是海绵城市预制式透水路面施工设备及施工方法,针对现有的透水路面施工由于工序过多,进而需要耗费大量时间,导致工作效率大幅降低问题,现提出如下方案,其包括设备主体,所述设备主体的底部固定连接有两两对称的四个第三固定板,位于同一侧的两个所述第三固定板的内部转动贯穿有同一个第一转轴,所述第一转轴的两端均固定连接有移动轮,本发明中,伺服电机的输出轴带动第三转轴转动,进而两个混凝土箱逐渐靠近再远离,完成混凝土浇筑操作,第三转轴带动偏心板横向移动,刮板将混凝土刮平,侧杆带动两个推动杆横向移动,压块在重力作用下将下方的土壤夯实,清扫轮带动刷毛转动,进而对道路上的灰尘进行清理。
Sponge city prefabricated permeable pavement construction equipment and construction method
The invention belongs to the field of sponge cities, particularly relates to prefabricated permeable pavement construction equipment and a construction method for a sponge city, and aims to solve the problems that a lot of time needs to be consumed and the working efficiency is greatly reduced due to excessive working procedures of existing permeable pavement construction. The bottom of the equipment body is fixedly connected with four third fixing plates which are symmetrical in pairs, the interiors of the two third fixing plates located on the same side rotationally penetrate through the same first rotating shaft, and the two ends of the first rotating shaft are fixedly connected with moving wheels. And a third rotating shaft drives an eccentric plate to transversely move, a scraper plate scrapes concrete to be flat, a side rod drives two pushing rods to transversely move, a pressing block puns soil below the pressing block under the action of gravity, a sweeping wheel drives bristles to rotate, and then dust on a road is cleaned.
本发明属于海绵城市领域,尤其是海绵城市预制式透水路面施工设备及施工方法,针对现有的透水路面施工由于工序过多,进而需要耗费大量时间,导致工作效率大幅降低问题,现提出如下方案,其包括设备主体,所述设备主体的底部固定连接有两两对称的四个第三固定板,位于同一侧的两个所述第三固定板的内部转动贯穿有同一个第一转轴,所述第一转轴的两端均固定连接有移动轮,本发明中,伺服电机的输出轴带动第三转轴转动,进而两个混凝土箱逐渐靠近再远离,完成混凝土浇筑操作,第三转轴带动偏心板横向移动,刮板将混凝土刮平,侧杆带动两个推动杆横向移动,压块在重力作用下将下方的土壤夯实,清扫轮带动刷毛转动,进而对道路上的灰尘进行清理。
Sponge city prefabricated permeable pavement construction equipment and construction method
海绵城市预制式透水路面施工设备及施工方法
WANG LINGFENG (Autor:in) / WU SHIFENG (Autor:in) / WU ZHANGYONG (Autor:in) / GONG XUDONG (Autor:in)
15.11.2024
Patent
Elektronische Ressource
Chinesisch
Permeable pavement for sponge city and construction method thereof
Europäisches Patentamt | 2022
|Permeable pavement based on sponge city and construction method thereof
Europäisches Patentamt | 2022
|