Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ceiling cutting ball net rack chord member gear filling method
The invention discloses a crown-cutting ball net rack chord member filling method, which comprises the following steps: splicing net rack blocks, and reserving a filling area between the adjacent net rack blocks, the filling area comprising a row of crown-cutting balls; a transverse chord member A on one side of the crown cutting ball A is assembled on the net rack sub-block on one side in the gear filling direction, and the crown cutting ball A is lifted up, is made to stand laterally and is communicated with the transverse chord member A, so that the crown cutting face of the crown cutting ball A is located on the side opposite to the transverse chord member A; after a transverse chord member B is assembled on the net rack blocks on the other side, the crown cutting ball A is horizontally rotated, so that the transverse chord member B is communicated with the crown cutting ball A, and the crown cutting surface of the crown cutting ball A is parallel to the transverse chord member A; two crown cutting balls adjacent to the crown cutting ball A are hoisted and laid flat; after the longitudinal chord member A on the crown cutting face side of the crown cutting ball A is assembled, the crown cutting ball A is horizontally rotated by 180 degrees, then the longitudinal chord member B is assembled, and the crown cutting ball A is flatly placed. The method is reasonable in step design, lossless gear filling is achieved through the particularity of the crown cutting ball form, the construction efficiency is high, and the construction quality is good.
本发明公开了一种削冠球网架弦杆补档方法,步骤:进行网架分块拼装,在相邻网架分块之间预留补档区域,补档区域包括一列削冠球;沿着补档方向在一侧的网架分块上拼装削冠球A一侧的横向弦杆A,吊起削冠球A并使其侧立且其与横向弦杆A相贯使得削冠球A削冠面位于与横向弦杆A相对一侧;在另一侧的网架分块上拼装横向弦杆B后,水平旋转削冠球A使得横向弦杆B与削冠球A相贯且削冠球A削冠面与横向弦杆A平行;吊起并放平与削冠球A相邻的两削冠球;拼装削冠球A削冠面侧的纵向弦杆A后,水平旋转削冠球A180°,再拼装纵向弦杆B,放平削冠球A。本发明的方法,步骤设计合理,利用削冠球形式的特殊性无损补档,施工效率高,施工质量好。
Ceiling cutting ball net rack chord member gear filling method
The invention discloses a crown-cutting ball net rack chord member filling method, which comprises the following steps: splicing net rack blocks, and reserving a filling area between the adjacent net rack blocks, the filling area comprising a row of crown-cutting balls; a transverse chord member A on one side of the crown cutting ball A is assembled on the net rack sub-block on one side in the gear filling direction, and the crown cutting ball A is lifted up, is made to stand laterally and is communicated with the transverse chord member A, so that the crown cutting face of the crown cutting ball A is located on the side opposite to the transverse chord member A; after a transverse chord member B is assembled on the net rack blocks on the other side, the crown cutting ball A is horizontally rotated, so that the transverse chord member B is communicated with the crown cutting ball A, and the crown cutting surface of the crown cutting ball A is parallel to the transverse chord member A; two crown cutting balls adjacent to the crown cutting ball A are hoisted and laid flat; after the longitudinal chord member A on the crown cutting face side of the crown cutting ball A is assembled, the crown cutting ball A is horizontally rotated by 180 degrees, then the longitudinal chord member B is assembled, and the crown cutting ball A is flatly placed. The method is reasonable in step design, lossless gear filling is achieved through the particularity of the crown cutting ball form, the construction efficiency is high, and the construction quality is good.
本发明公开了一种削冠球网架弦杆补档方法,步骤:进行网架分块拼装,在相邻网架分块之间预留补档区域,补档区域包括一列削冠球;沿着补档方向在一侧的网架分块上拼装削冠球A一侧的横向弦杆A,吊起削冠球A并使其侧立且其与横向弦杆A相贯使得削冠球A削冠面位于与横向弦杆A相对一侧;在另一侧的网架分块上拼装横向弦杆B后,水平旋转削冠球A使得横向弦杆B与削冠球A相贯且削冠球A削冠面与横向弦杆A平行;吊起并放平与削冠球A相邻的两削冠球;拼装削冠球A削冠面侧的纵向弦杆A后,水平旋转削冠球A180°,再拼装纵向弦杆B,放平削冠球A。本发明的方法,步骤设计合理,利用削冠球形式的特殊性无损补档,施工效率高,施工质量好。
Ceiling cutting ball net rack chord member gear filling method
一种削冠球网架弦杆补档方法
WANG FUQIANG (Autor:in) / HUANG QIANG (Autor:in) / LIU YUWEI (Autor:in) / WANG FUCHEN (Autor:in) / WANG GUANGWEI (Autor:in)
15.11.2024
Patent
Elektronische Ressource
Chinesisch
METHOD FOR COMBINE CHORD WITH RACK GEAR OF LEG FOR FLOATING STRUCTURE
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2023
|RACK FOR SUSPENDED CEILING SUPPORT STRUCTURE AND METHOD OF RACK PROCESSING
Europäisches Patentamt | 2016
|Europäisches Patentamt | 2022
|