Concrete pouring construction and maintenance method for house building
A house building concrete pouring construction and maintenance method comprises the following steps that S1, preparation work before pouring construction is conducted; s2, concrete pouring construction; s21, bottom plate pouring construction is conducted; s22, wall plate pouring construction is conducted; s221, wallboard pouring preparation work is carried out; s222, wall plate pouring is carried out; S223, wall plate leveling is carried out; s3, quality detection; and S4, concrete curing. Through construction organization deployment, construction preparation, construction and result quality inspection, the process is more reasonable and detailed. And the requirement of high quality can be met while more time is saved for a construction task. And more optimized construction and maintenance methods are adopted, so that the two methods supplement each other to achieve the effect of one plus one greater than two. And the construction procedures are scientifically overlapped, and the construction targets of quality, safety, progress and civilization are comprehensively completed.
一种房屋建筑混凝土浇筑施工及其养护方法,包括以下步骤,S1,浇筑施工前准备工作;S2,混凝土浇筑施工;S21,底板浇筑施工;S22,墙板浇筑施工;S221,墙板浇筑准备工作;S222,墙板浇筑,S223,墙板找平;S3,质量检测;S4,混凝土养护。本发明通过施工组织部署、施工准备、施工以及成果质检,使过程更加合理化、细节化。可以另施工任务更加节省时间的同时达到高质量的要求。采用了更优化的施工以及养护方法,使两者相辅相成起到了一加一大于二的效果。科学搭接施工工序,全面完成质量、安全、进度、文明施工目标。
Concrete pouring construction and maintenance method for house building
A house building concrete pouring construction and maintenance method comprises the following steps that S1, preparation work before pouring construction is conducted; s2, concrete pouring construction; s21, bottom plate pouring construction is conducted; s22, wall plate pouring construction is conducted; s221, wallboard pouring preparation work is carried out; s222, wall plate pouring is carried out; S223, wall plate leveling is carried out; s3, quality detection; and S4, concrete curing. Through construction organization deployment, construction preparation, construction and result quality inspection, the process is more reasonable and detailed. And the requirement of high quality can be met while more time is saved for a construction task. And more optimized construction and maintenance methods are adopted, so that the two methods supplement each other to achieve the effect of one plus one greater than two. And the construction procedures are scientifically overlapped, and the construction targets of quality, safety, progress and civilization are comprehensively completed.
一种房屋建筑混凝土浇筑施工及其养护方法,包括以下步骤,S1,浇筑施工前准备工作;S2,混凝土浇筑施工;S21,底板浇筑施工;S22,墙板浇筑施工;S221,墙板浇筑准备工作;S222,墙板浇筑,S223,墙板找平;S3,质量检测;S4,混凝土养护。本发明通过施工组织部署、施工准备、施工以及成果质检,使过程更加合理化、细节化。可以另施工任务更加节省时间的同时达到高质量的要求。采用了更优化的施工以及养护方法,使两者相辅相成起到了一加一大于二的效果。科学搭接施工工序,全面完成质量、安全、进度、文明施工目标。
Concrete pouring construction and maintenance method for house building
一种房屋建筑混凝土浇筑施工及其养护方法
JIANG CAIYOU (Autor:in) / HE JING (Autor:in) / MA LIXIA (Autor:in) / ZHENG LI (Autor:in) / ZHENG ZHIWEI (Autor:in)
19.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete pouring device for house building construction
Europäisches Patentamt | 2023
|Concrete pouring device for house building construction
Europäisches Patentamt | 2024
|Maintenance device after concrete pouring in building construction
Europäisches Patentamt | 2021
|House building construction concrete auxiliary pouring device
Europäisches Patentamt | 2023
|House building concrete pouring equipment and pouring method
Europäisches Patentamt | 2024
|