Winter concrete construction thermal insulation structure and construction method
The invention relates to the technical field of building construction, in particular to a winter concrete construction heat preservation structure and a construction method, which are used for carrying out heating and heat preservation treatment on poured concrete when the temperature is lower than a set temperature and ensuring the quality of the concrete after curing is completed. The outer surface of the supporting formwork of the supporting column is coated with the first heat preservation layer, the outer side of the first heat preservation layer is coated with the first thin film layer, meanwhile, the second thin film layer is laid on the upper surface of the cast-in-place concrete slab, the second heat preservation layer is laid on the upper surface of the second thin film layer, and the third thin film layer is laid on the upper surface of the second heat preservation layer; the heating device is used for generating heat to enable the curing temperature of the cast-in-place concrete to be higher than the set temperature, the quality of the cast-in-place concrete is guaranteed, and concrete cracking caused by low temperature is avoided.
本发明涉及建筑施工技术领域,具体为一种冬季砼施工保温结构及施工方法,用于在温度低于设定温度时对浇筑的混凝土进行升温保温处理,保证养护完成后混凝土的质量。本发明,通过在支撑柱的支撑模板外表面包覆第一保温层,并在第一保温层的外侧包覆第一薄膜层,同时在现浇混凝土板的上表面铺设第二薄膜层,在第二薄膜层的上表面铺设第二保温层,在第二保温层的上表面铺设第三薄膜层,利用加热装置产生热量来实现现浇混凝土的养护温度在设定温度以上,保证现浇混凝土的质量,避免因低温出现混凝土开裂。
Winter concrete construction thermal insulation structure and construction method
The invention relates to the technical field of building construction, in particular to a winter concrete construction heat preservation structure and a construction method, which are used for carrying out heating and heat preservation treatment on poured concrete when the temperature is lower than a set temperature and ensuring the quality of the concrete after curing is completed. The outer surface of the supporting formwork of the supporting column is coated with the first heat preservation layer, the outer side of the first heat preservation layer is coated with the first thin film layer, meanwhile, the second thin film layer is laid on the upper surface of the cast-in-place concrete slab, the second heat preservation layer is laid on the upper surface of the second thin film layer, and the third thin film layer is laid on the upper surface of the second heat preservation layer; the heating device is used for generating heat to enable the curing temperature of the cast-in-place concrete to be higher than the set temperature, the quality of the cast-in-place concrete is guaranteed, and concrete cracking caused by low temperature is avoided.
本发明涉及建筑施工技术领域,具体为一种冬季砼施工保温结构及施工方法,用于在温度低于设定温度时对浇筑的混凝土进行升温保温处理,保证养护完成后混凝土的质量。本发明,通过在支撑柱的支撑模板外表面包覆第一保温层,并在第一保温层的外侧包覆第一薄膜层,同时在现浇混凝土板的上表面铺设第二薄膜层,在第二薄膜层的上表面铺设第二保温层,在第二保温层的上表面铺设第三薄膜层,利用加热装置产生热量来实现现浇混凝土的养护温度在设定温度以上,保证现浇混凝土的质量,避免因低温出现混凝土开裂。
Winter concrete construction thermal insulation structure and construction method
冬季砼施工保温结构及施工方法
LIU TIANHONG (Autor:in) / JIA SHUAI (Autor:in) / WANG YI (Autor:in) / LI LIANGYONG (Autor:in)
19.11.2024
Patent
Elektronische Ressource
Chinesisch
Mass concrete winter construction thermal insulation structure and construction method thereof
Europäisches Patentamt | 2023
|Method for thermal insulation covering of concrete floor in winter construction
Europäisches Patentamt | 2023
|Construction method of thermal insulation concrete wall
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|