Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water conservancy project anti-seismic structure
The invention belongs to the technical field of water conservancy projects, and particularly relates to a water conservancy project anti-seismic structure which is characterized in that a baffle comprises an outer baffle and an inner baffle, the outer baffle comprises a first side baffle and a second side baffle, and the first side baffle and the second side baffle are spliced to form the outer baffle; the first side baffle and the second side baffle are detachably connected, an inner baffle is installed in the middle of the outer baffle, a connecting plate is arranged at the right end of the inner baffle, the connecting plate and the outer baffle are connected through a bolt, a supporting plate is placed on the right side of the connecting plate, and the supporting plate and the outer baffle are in sliding connection. Under the limiting effect of a limiting block, when the distance between a connecting plate and a supporting plate is located at the maximum position, a thrust spring is still in the state of extruding the connecting plate, the state stability of the whole structure is improved, shaking is avoided, other auxiliary devices do not need to be installed, when a baffle is impacted, buffering can be conducted through the thrust spring, and the service life of the baffle is prolonged. The shock resistance of the baffle is improved.
本发明公开的属于水利工程技术领域,具体为一种水利工程抗震结构,所述挡板包括外挡板和内挡板,所述外挡板包括第一侧挡板和第二侧挡板,所述第一侧挡板和第二侧挡板之间拼接后构成外挡板,所述第一侧挡板和第二侧挡板之间为可拆卸连接,所述外挡板中部安装有内挡板,所述内挡板右端设置有连接板,所述连接板和外挡板之间通过螺栓连接,所述连接板右侧放置有支撑板,所述支撑板和外挡板之间滑动连接,在限位块的限位作用下,使连接板和支撑板之间间距处于最大处时,推力弹簧仍处于挤压连接板的状态,提高整体结构的状态稳定性,避免轻易出现晃动,且无需安装其他辅助装置,当挡板受到冲击时,通过推力弹簧能够进行缓冲,提高挡板的抗震性。
Water conservancy project anti-seismic structure
The invention belongs to the technical field of water conservancy projects, and particularly relates to a water conservancy project anti-seismic structure which is characterized in that a baffle comprises an outer baffle and an inner baffle, the outer baffle comprises a first side baffle and a second side baffle, and the first side baffle and the second side baffle are spliced to form the outer baffle; the first side baffle and the second side baffle are detachably connected, an inner baffle is installed in the middle of the outer baffle, a connecting plate is arranged at the right end of the inner baffle, the connecting plate and the outer baffle are connected through a bolt, a supporting plate is placed on the right side of the connecting plate, and the supporting plate and the outer baffle are in sliding connection. Under the limiting effect of a limiting block, when the distance between a connecting plate and a supporting plate is located at the maximum position, a thrust spring is still in the state of extruding the connecting plate, the state stability of the whole structure is improved, shaking is avoided, other auxiliary devices do not need to be installed, when a baffle is impacted, buffering can be conducted through the thrust spring, and the service life of the baffle is prolonged. The shock resistance of the baffle is improved.
本发明公开的属于水利工程技术领域,具体为一种水利工程抗震结构,所述挡板包括外挡板和内挡板,所述外挡板包括第一侧挡板和第二侧挡板,所述第一侧挡板和第二侧挡板之间拼接后构成外挡板,所述第一侧挡板和第二侧挡板之间为可拆卸连接,所述外挡板中部安装有内挡板,所述内挡板右端设置有连接板,所述连接板和外挡板之间通过螺栓连接,所述连接板右侧放置有支撑板,所述支撑板和外挡板之间滑动连接,在限位块的限位作用下,使连接板和支撑板之间间距处于最大处时,推力弹簧仍处于挤压连接板的状态,提高整体结构的状态稳定性,避免轻易出现晃动,且无需安装其他辅助装置,当挡板受到冲击时,通过推力弹簧能够进行缓冲,提高挡板的抗震性。
Water conservancy project anti-seismic structure
一种水利工程抗震结构
WANG XIAODONG (Autor:in) / KO JONG-CHANG (Autor:in) / ZHANG LIANG (Autor:in) / YU TIANLONG (Autor:in) / WANG DONGSHENG (Autor:in) / BAO GUOPING (Autor:in)
22.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
F16F
SPRINGS
,
Federn
Lifting type water conservancy gate structure for water conservancy project
Europäisches Patentamt | 2022
|Simple-to-construct anti-seismic silt-blocking guardrail for water conservancy project
Europäisches Patentamt | 2020
|Water conservancy pipeline for water conservancy project
Europäisches Patentamt | 2022
|