Reinforcing construction method for reverse ridge formwork
The invention discloses a reinforcing construction method for a reverse ridge formwork. The reinforcing construction method comprises the following construction steps that S1, surveying and setting-out are conducted, specifically, positioning and setting-out are conducted on a reverse ridge part; s2, scabbling and cleaning: scabbling and cleaning the bottom of the reverse ridge; and S3, formwork installation and reinforcement are conducted, specifically, when the device is installed, the square pipe is shifted to the outer side, the screw is shifted to the upper side, the reinforcing device is placed on the outer side of a formwork to be poured, then the screw square pipe is adjusted according to the width of the reverse ridge, then the square pipe is fixed through a fixing piece by screwing a nut on the upper portion of the square pipe, and finally the screw is adjusted to the proper position according to the height of the reverse ridge. The construction is completed by fixing the screw rod; s4, concrete pouring is conducted, specifically, a vibrating bar is used for vibrating and compacting, and the side face of the formwork is beaten in the process; s5, concrete surface finishing is conducted, specifically, the reverse ridge concrete surface is subjected to surface finishing, and a concrete surface layer is covered with a thin film when necessary; and S6, the formwork reinforcing device is demolded, and concrete curing is conducted. The device can be suitable for various reverse sills, the size can be freely adjusted according to the height and width of the reverse sills, and cost is saved.
本发明公开了一种反坎模板加固施工方法,包括以下施工步骤:S1:测量放线:反坎部位定位放线;S2:凿毛清理:反坎底部进行凿毛,清理;S3:模板安装、加固:安装本装置先将方管拨到外侧、将螺杆拨到上侧,将本加固装置放置在待浇筑的模板外侧后根据反坎宽度调整螺杆方管,再通过旋拧方管上部螺母,通过固定件将方管固定,最后根据反坎高度将螺杆调整至合适位置,固定螺杆即施工完成;S4:混凝土浇筑:用振动棒振捣密实,过程中对模板侧面敲打;S5:混凝土收面:对反坎混凝土表面进行收光,必要时混凝土面层覆盖薄膜;S6:模板加固装置拆模,混凝土养护。本发明可适用于多种反坎,根据反坎的高度、宽度自由调节尺寸,节约了成本。
Reinforcing construction method for reverse ridge formwork
The invention discloses a reinforcing construction method for a reverse ridge formwork. The reinforcing construction method comprises the following construction steps that S1, surveying and setting-out are conducted, specifically, positioning and setting-out are conducted on a reverse ridge part; s2, scabbling and cleaning: scabbling and cleaning the bottom of the reverse ridge; and S3, formwork installation and reinforcement are conducted, specifically, when the device is installed, the square pipe is shifted to the outer side, the screw is shifted to the upper side, the reinforcing device is placed on the outer side of a formwork to be poured, then the screw square pipe is adjusted according to the width of the reverse ridge, then the square pipe is fixed through a fixing piece by screwing a nut on the upper portion of the square pipe, and finally the screw is adjusted to the proper position according to the height of the reverse ridge. The construction is completed by fixing the screw rod; s4, concrete pouring is conducted, specifically, a vibrating bar is used for vibrating and compacting, and the side face of the formwork is beaten in the process; s5, concrete surface finishing is conducted, specifically, the reverse ridge concrete surface is subjected to surface finishing, and a concrete surface layer is covered with a thin film when necessary; and S6, the formwork reinforcing device is demolded, and concrete curing is conducted. The device can be suitable for various reverse sills, the size can be freely adjusted according to the height and width of the reverse sills, and cost is saved.
本发明公开了一种反坎模板加固施工方法,包括以下施工步骤:S1:测量放线:反坎部位定位放线;S2:凿毛清理:反坎底部进行凿毛,清理;S3:模板安装、加固:安装本装置先将方管拨到外侧、将螺杆拨到上侧,将本加固装置放置在待浇筑的模板外侧后根据反坎宽度调整螺杆方管,再通过旋拧方管上部螺母,通过固定件将方管固定,最后根据反坎高度将螺杆调整至合适位置,固定螺杆即施工完成;S4:混凝土浇筑:用振动棒振捣密实,过程中对模板侧面敲打;S5:混凝土收面:对反坎混凝土表面进行收光,必要时混凝土面层覆盖薄膜;S6:模板加固装置拆模,混凝土养护。本发明可适用于多种反坎,根据反坎的高度、宽度自由调节尺寸,节约了成本。
Reinforcing construction method for reverse ridge formwork
反坎模板加固施工方法
MAN KAIGUO (Autor:in) / YANG HONG (Autor:in) / XIAO LI (Autor:in) / KUANG PENGSHUN (Autor:in) / DU WENCHENG (Autor:in) / SHI MENGYUAN (Autor:in) / JIN SHANGHUA (Autor:in) / LIN JIFENG (Autor:in)
22.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Reverse ridge reinforcing device and reverse ridge formwork frame
Europäisches Patentamt | 2021
|Reverse ridge reinforcing device and reverse ridge formwork system
Europäisches Patentamt | 2021
|Concrete reverse ridge suspended formwork reinforcing structure and construction method
Europäisches Patentamt | 2023
|Reinforcing method for reverse ridge formwork of toilet
Europäisches Patentamt | 2022
|Novel reinforcing component for aluminum alloy formwork reverse ridge
Europäisches Patentamt | 2024
|