Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Split type ascending type movable formwork
The invention provides a split type ascending type movable formwork which comprises an ascending type movable formwork body and a steel bar binding rack, the ascending type movable formwork body comprises a main beam assembly, a supporting leg assembly and an outer formwork hanging assembly, an outer formwork is installed on the outer formwork hanging assembly, the outer formwork is hung below a main beam through the outer formwork hanging assembly, and the steel bar binding rack is arranged on the outer formwork hanging assembly. The steel bar binding rack is located on a bridge behind the ascending type movable formwork body and comprises a rack body, a rack walking mechanism and a portal crane, a front crane carriage and a rear crane carriage are installed on the rear guide beam and the main beam, and lifting appliances are detachably connected to the front crane carriage and the rear crane carriage. And the whole reinforcement cage is hoisted into the mold in cooperation with a portal crane. Steel bar binding and concrete bridge pouring, curing and tensioning procedures are carried out at the same time, the construction efficiency is high, and the construction period is short.
本发明提供了一种分体式上行式移动模架,包括上行式移动模架本体和钢筋绑扎台架,上行式移动模架本体包括主梁总成、支腿总成和外模吊挂总成,外模吊挂总成上安装有外模板,外模板通过外模吊挂总成吊挂于主梁的下方,钢筋绑扎台架位于上行式移动模架本体后方的桥梁上,钢筋绑扎台架包括台架本体、台架走行机构和门机,后导梁和主梁上安装有前起重小车和后起重小车,前起重小车和后起重小车上可拆卸连接有吊具,配合门机进行钢筋笼整体的吊装入模。使绑扎钢筋与混凝土桥梁浇注、养生、张拉工序同时进行,施工效率高、工期短。
Split type ascending type movable formwork
The invention provides a split type ascending type movable formwork which comprises an ascending type movable formwork body and a steel bar binding rack, the ascending type movable formwork body comprises a main beam assembly, a supporting leg assembly and an outer formwork hanging assembly, an outer formwork is installed on the outer formwork hanging assembly, the outer formwork is hung below a main beam through the outer formwork hanging assembly, and the steel bar binding rack is arranged on the outer formwork hanging assembly. The steel bar binding rack is located on a bridge behind the ascending type movable formwork body and comprises a rack body, a rack walking mechanism and a portal crane, a front crane carriage and a rear crane carriage are installed on the rear guide beam and the main beam, and lifting appliances are detachably connected to the front crane carriage and the rear crane carriage. And the whole reinforcement cage is hoisted into the mold in cooperation with a portal crane. Steel bar binding and concrete bridge pouring, curing and tensioning procedures are carried out at the same time, the construction efficiency is high, and the construction period is short.
本发明提供了一种分体式上行式移动模架,包括上行式移动模架本体和钢筋绑扎台架,上行式移动模架本体包括主梁总成、支腿总成和外模吊挂总成,外模吊挂总成上安装有外模板,外模板通过外模吊挂总成吊挂于主梁的下方,钢筋绑扎台架位于上行式移动模架本体后方的桥梁上,钢筋绑扎台架包括台架本体、台架走行机构和门机,后导梁和主梁上安装有前起重小车和后起重小车,前起重小车和后起重小车上可拆卸连接有吊具,配合门机进行钢筋笼整体的吊装入模。使绑扎钢筋与混凝土桥梁浇注、养生、张拉工序同时进行,施工效率高、工期短。
Split type ascending type movable formwork
一种分体式上行式移动模架
LI JIWEI (Autor:in) / ZHANG GUANGMING (Autor:in) / WANG YANFANG (Autor:in) / LI WEIQI (Autor:in) / DU XIAOGANG (Autor:in) / TANG KUNYUAN (Autor:in) / CAO CUI (Autor:in) / HAO YONGGANG (Autor:in) / SU LIUSHUAI (Autor:in) / WANG ZHENGWU (Autor:in)
26.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Construction method of split type ascending type movable formwork
Europäisches Patentamt | 2024
|Typhoon prevention method for ascending type movable formwork
Europäisches Patentamt | 2021
|Double-main-beam ascending type movable formwork and application thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|