Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of building construction equipment, in particular to a road and bridge construction formwork fixing opposite-pull rod structure which comprises a fixing plate, a threaded column and a fixing mechanism, the threaded column is fixedly connected with the fixing plate and located on one side of the fixing plate, and the fixing mechanism comprises a moving plate, a clamping ring, a threaded ring, a connecting plate and an adjusting assembly. The movable plate is in sliding connection with the threaded column, the clamping ring is rotationally connected with the movable plate and located on one side of the movable plate, the cross section of the clamping ring is in an L shape, the threaded ring is fixedly connected with the threaded column and the clamping ring, the connecting plate is fixedly connected with the threaded ring and located on one side of the threaded ring, and the adjusting assembly is arranged on one side of the connecting plate. Through the arrangement of the structure, the problems that in the prior art, the push nut and the clamping plate B are arranged in a separated mode, the separation nut needs to be taken down at present, then the clamping plate B needs to be taken down, and the working efficiency is affected are solved.
本发明涉及建筑施工设备技术领域,具体涉及一种路桥施工模板固定对拉杆结构,包括固定板、螺纹柱和固定机构,螺纹柱与固定板固定连接,并位于固定板的一侧,固定机构包括移动板、卡环、螺纹环、连接板和调节组件,移动板与螺纹柱滑动连接,卡环与移动板转动连接,并位于移动板的一侧,卡环的横截面呈L形设置,螺纹环与螺纹柱固定连接,螺纹环与卡环固定连接,连接板与螺纹环固定连接,并位于螺纹环的一侧,调节组件设置在连接板的一侧,通过上述结构的设置,解决了现有技术,推动螺母与B夹板分离设置,在拆卸时,需要现将分离螺母取下后,再将B夹板取下,影响工作效率的问题。
The invention relates to the technical field of building construction equipment, in particular to a road and bridge construction formwork fixing opposite-pull rod structure which comprises a fixing plate, a threaded column and a fixing mechanism, the threaded column is fixedly connected with the fixing plate and located on one side of the fixing plate, and the fixing mechanism comprises a moving plate, a clamping ring, a threaded ring, a connecting plate and an adjusting assembly. The movable plate is in sliding connection with the threaded column, the clamping ring is rotationally connected with the movable plate and located on one side of the movable plate, the cross section of the clamping ring is in an L shape, the threaded ring is fixedly connected with the threaded column and the clamping ring, the connecting plate is fixedly connected with the threaded ring and located on one side of the threaded ring, and the adjusting assembly is arranged on one side of the connecting plate. Through the arrangement of the structure, the problems that in the prior art, the push nut and the clamping plate B are arranged in a separated mode, the separation nut needs to be taken down at present, then the clamping plate B needs to be taken down, and the working efficiency is affected are solved.
本发明涉及建筑施工设备技术领域,具体涉及一种路桥施工模板固定对拉杆结构,包括固定板、螺纹柱和固定机构,螺纹柱与固定板固定连接,并位于固定板的一侧,固定机构包括移动板、卡环、螺纹环、连接板和调节组件,移动板与螺纹柱滑动连接,卡环与移动板转动连接,并位于移动板的一侧,卡环的横截面呈L形设置,螺纹环与螺纹柱固定连接,螺纹环与卡环固定连接,连接板与螺纹环固定连接,并位于螺纹环的一侧,调节组件设置在连接板的一侧,通过上述结构的设置,解决了现有技术,推动螺母与B夹板分离设置,在拆卸时,需要现将分离螺母取下后,再将B夹板取下,影响工作效率的问题。
Road and bridge construction formwork fixing opposite-pull rod structure
一种路桥施工模板固定对拉杆结构
LIU RUI (Autor:in)
26.11.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Novel aluminum alloy formwork adopting opposite pull rods
Europäisches Patentamt | 2022
|Opposite-pull screw for shear wall formwork erection construction and construction method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|