Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Basement exterior wall post-cast strip steel plate sealing construction method
The invention relates to the technical field of advanced plugging of a basement outer wall post-cast strip, and discloses a steel plate sealing construction method for the basement outer wall post-cast strip. The method comprises the steps that firstly, outer wall post-cast strip closing steel plates are machined; 2, preparation before construction; 3, removing and cleaning impurities of the post-cast strip; fourthly, steel bars are derusted, repaired, corrected, bound or subjected to repair welding; 5, hoisting and fixing the closed steel plate; sixthly, the fifth step is repeated till the post-cast strip is completely sealed; seventhly, the butt joint of the post-cast strip closed steel plates is subjected to double-face welding; step 8, performing waterproof treatment; the basement outer wall post-cast strip steel plate sealing construction method is characterized in that the two ends of the steel plate are fixed to the outer wall face through expansion screws, one end of the steel plate is a fixed end, and the other end of the steel plate is a movable end, so that the structural settlement telescopic requirement is met.
本发明涉及地下室外墙后浇带提前封堵技术领域,且公开了一种地下室外墙后浇带钢板封闭施工方法,本发明包括如下步骤;步骤一:加工外墙后浇带封闭钢板;步骤二:施工前准备;步骤三:拆除、清理后浇带杂物;步骤四:钢筋除锈、修复、校正、绑扎或补焊;步骤五:封闭钢板吊运与固定;步骤六:重复步骤五直至后浇带被完全封闭;步骤七:对后浇带封闭钢板对接处进行双面焊接;步骤八:进行防水处理;步骤九:地下室外墙回填土施工,本发明中,地下室外墙后浇带钢板封闭施工工法最大特点就是钢板两端用膨胀螺丝固定于外墙面上,一端为固定端,一端为活动端,以满足结构沉降伸缩要求。
Basement exterior wall post-cast strip steel plate sealing construction method
The invention relates to the technical field of advanced plugging of a basement outer wall post-cast strip, and discloses a steel plate sealing construction method for the basement outer wall post-cast strip. The method comprises the steps that firstly, outer wall post-cast strip closing steel plates are machined; 2, preparation before construction; 3, removing and cleaning impurities of the post-cast strip; fourthly, steel bars are derusted, repaired, corrected, bound or subjected to repair welding; 5, hoisting and fixing the closed steel plate; sixthly, the fifth step is repeated till the post-cast strip is completely sealed; seventhly, the butt joint of the post-cast strip closed steel plates is subjected to double-face welding; step 8, performing waterproof treatment; the basement outer wall post-cast strip steel plate sealing construction method is characterized in that the two ends of the steel plate are fixed to the outer wall face through expansion screws, one end of the steel plate is a fixed end, and the other end of the steel plate is a movable end, so that the structural settlement telescopic requirement is met.
本发明涉及地下室外墙后浇带提前封堵技术领域,且公开了一种地下室外墙后浇带钢板封闭施工方法,本发明包括如下步骤;步骤一:加工外墙后浇带封闭钢板;步骤二:施工前准备;步骤三:拆除、清理后浇带杂物;步骤四:钢筋除锈、修复、校正、绑扎或补焊;步骤五:封闭钢板吊运与固定;步骤六:重复步骤五直至后浇带被完全封闭;步骤七:对后浇带封闭钢板对接处进行双面焊接;步骤八:进行防水处理;步骤九:地下室外墙回填土施工,本发明中,地下室外墙后浇带钢板封闭施工工法最大特点就是钢板两端用膨胀螺丝固定于外墙面上,一端为固定端,一端为活动端,以满足结构沉降伸缩要求。
Basement exterior wall post-cast strip steel plate sealing construction method
一种地下室外墙后浇带钢板封闭施工方法
FAN ZHIGANG (Autor:in) / LI JIANHUI (Autor:in) / CHEN YONGQIANG (Autor:in) / WANG HAO (Autor:in) / XU YUNFEI (Autor:in)
26.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement exterior wall post-cast strip pre-sealing structure and construction method
Europäisches Patentamt | 2024
|Interpenetration sealing construction method for post-cast strip of basement exterior wall
Europäisches Patentamt | 2023
|Basement exterior wall settlement post-cast strip sealing structure and construction method thereof
Europäisches Patentamt | 2024
|Basement exterior wall post-cast strip pre-embedded pre-sealing structure and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|