Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Device and method for pulling out super-long pile foundation concrete pile casing
The invention relates to the technical field of road and bridge construction equipment, and discloses a super-long pile foundation concrete pile casing pulling-out device which comprises a base, a pull-out device and a pull-out device. The adjusting mechanism is mounted at the position of the base; and the grabbing and clamping mechanism is installed on one side of the adjusting mechanism so as to be matched with the adjusting mechanism to conduct position adjustment, the grabbing and clamping mechanism comprises a driving assembly and a clamping assembly, the driving assembly is used for adapting to different pile casing diameters, and the clamping assembly is used for clamping the adapted pile casings. Under the joint cooperation of the driving assembly and the clamping assemblies, pile casings with different diameters can be clamped, so that under the joint action of the multiple sets of clamping assemblies, the direct action on the pile casings is reduced, stress is more uniform, damage to the pile casings is effectively reduced, the maintenance cost is reduced, and the engineering efficiency is improved.
本发明涉及路桥施工设备技术领域,公开了一种超长桩基混凝土护筒拔出装置包括:基座,所述基座安装于大吨位移动设备处;调节机构,所述调节机构安装于基座处;抓夹机构,所述抓夹机构安装于调节机构一侧,以配合调节机构进行位置调节,抓夹机构包括驱动组件和夹持组件,所述驱动组件用于适应不同护筒直径,所述夹持组件用于对适应后的护筒进行夹持。本发明通过利用驱动组件与夹持组件的共同配合下,可以对不同直径的护筒进行夹持,从而在多组夹持组件共同作用下,降低了对护筒的直接作用下,受力更加均匀,有效降低对护筒的损伤,从而降低维护成本,并提高工程效率。
Device and method for pulling out super-long pile foundation concrete pile casing
The invention relates to the technical field of road and bridge construction equipment, and discloses a super-long pile foundation concrete pile casing pulling-out device which comprises a base, a pull-out device and a pull-out device. The adjusting mechanism is mounted at the position of the base; and the grabbing and clamping mechanism is installed on one side of the adjusting mechanism so as to be matched with the adjusting mechanism to conduct position adjustment, the grabbing and clamping mechanism comprises a driving assembly and a clamping assembly, the driving assembly is used for adapting to different pile casing diameters, and the clamping assembly is used for clamping the adapted pile casings. Under the joint cooperation of the driving assembly and the clamping assemblies, pile casings with different diameters can be clamped, so that under the joint action of the multiple sets of clamping assemblies, the direct action on the pile casings is reduced, stress is more uniform, damage to the pile casings is effectively reduced, the maintenance cost is reduced, and the engineering efficiency is improved.
本发明涉及路桥施工设备技术领域,公开了一种超长桩基混凝土护筒拔出装置包括:基座,所述基座安装于大吨位移动设备处;调节机构,所述调节机构安装于基座处;抓夹机构,所述抓夹机构安装于调节机构一侧,以配合调节机构进行位置调节,抓夹机构包括驱动组件和夹持组件,所述驱动组件用于适应不同护筒直径,所述夹持组件用于对适应后的护筒进行夹持。本发明通过利用驱动组件与夹持组件的共同配合下,可以对不同直径的护筒进行夹持,从而在多组夹持组件共同作用下,降低了对护筒的直接作用下,受力更加均匀,有效降低对护筒的损伤,从而降低维护成本,并提高工程效率。
Device and method for pulling out super-long pile foundation concrete pile casing
一种超长桩基混凝土护筒拔出装置及方法
ZHANG YONG (Autor:in) / LIU BO (Autor:in) / WU JINGJIANG (Autor:in) / YE JIABIN (Autor:in) / LU SONG (Autor:in) / XIE HAO (Autor:in) / LI JIANWEI (Autor:in) / YUAN JINBO (Autor:in) / LI YUANHUI (Autor:in) / WU ANNAN (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile casing pulling auxiliary device of concrete pouring pile
Europäisches Patentamt | 2022
|Pile casing pulling auxiliary device of concrete pouring pile
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|