Post-cast strip construction method based on protection groove
The invention discloses a post-cast strip construction method based on a protection groove. The protection groove comprises a bottom plate, side plates and reserved steel bars. Two parallel side plates are arranged at the top of the bottom plate, and concrete blocking in the structural concrete pouring process is completed through the side plates; the reserved steel bars penetrate through the two side plates, and clearance spaces are formed between the reserved steel bars and the bottom plate and serve as sediment grooves; the post-cast strip construction method comprises the steps that before a protection groove is installed, sinking treatment is conducted in a post-cast strip installation area according to the width of the protection groove, then construction of a structure leveling layer, a waterproof layer and a protection layer is completed in sequence, then the protection groove is installed, and all reserved steel bars are connected with steel bars in structure concrete; and after reserved steel bar connection is completed, structural concrete pouring construction is conducted, when structural concrete reaches the preset strength, a protective cover plate is installed at the top end of the protective groove, and the post-cast strip is closed, the protective cover plate is taken away and moved away, and concrete pouring is adopted till the tops of the side plates are flush.
本申请公开了一种基于防护槽的后浇带施工方法,防护槽包括:底板、侧板和预留钢筋;所述底板顶部设有两平行侧板,通过侧板完成结构混凝土浇筑过程的混凝土阻隔;各预留钢筋贯穿于两侧板设置,所述预留钢筋与所述底板之间设有间隙空间,所述间隙空间作为沉渣槽;所述后浇带施工方法包括:防护槽安装前,根据防护槽宽度在后浇带安装区域做下沉处理,再依次完成结构找平层、防水层、保护层施工,然后安装防护槽,并完成各预留钢筋与结构混凝土内钢筋相连;完成预留钢筋连接后,进行结构混凝土浇筑施工,待结构混凝土达到预设强度,在防护槽顶端安装保护盖板,封闭后浇带时,将保护盖板取开移走,采用混凝土浇筑至侧板的顶部齐平。
Post-cast strip construction method based on protection groove
The invention discloses a post-cast strip construction method based on a protection groove. The protection groove comprises a bottom plate, side plates and reserved steel bars. Two parallel side plates are arranged at the top of the bottom plate, and concrete blocking in the structural concrete pouring process is completed through the side plates; the reserved steel bars penetrate through the two side plates, and clearance spaces are formed between the reserved steel bars and the bottom plate and serve as sediment grooves; the post-cast strip construction method comprises the steps that before a protection groove is installed, sinking treatment is conducted in a post-cast strip installation area according to the width of the protection groove, then construction of a structure leveling layer, a waterproof layer and a protection layer is completed in sequence, then the protection groove is installed, and all reserved steel bars are connected with steel bars in structure concrete; and after reserved steel bar connection is completed, structural concrete pouring construction is conducted, when structural concrete reaches the preset strength, a protective cover plate is installed at the top end of the protective groove, and the post-cast strip is closed, the protective cover plate is taken away and moved away, and concrete pouring is adopted till the tops of the side plates are flush.
本申请公开了一种基于防护槽的后浇带施工方法,防护槽包括:底板、侧板和预留钢筋;所述底板顶部设有两平行侧板,通过侧板完成结构混凝土浇筑过程的混凝土阻隔;各预留钢筋贯穿于两侧板设置,所述预留钢筋与所述底板之间设有间隙空间,所述间隙空间作为沉渣槽;所述后浇带施工方法包括:防护槽安装前,根据防护槽宽度在后浇带安装区域做下沉处理,再依次完成结构找平层、防水层、保护层施工,然后安装防护槽,并完成各预留钢筋与结构混凝土内钢筋相连;完成预留钢筋连接后,进行结构混凝土浇筑施工,待结构混凝土达到预设强度,在防护槽顶端安装保护盖板,封闭后浇带时,将保护盖板取开移走,采用混凝土浇筑至侧板的顶部齐平。
Post-cast strip construction method based on protection groove
一种基于防护槽的后浇带施工方法
PENG DEKUN (Autor:in) / LI DAKE (Autor:in) / WANG ZHONGQUAN (Autor:in) / REN BOKUN (Autor:in) / WU BO (Autor:in) / WANG JINHAO (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Post-cast strip protection wall and construction method thereof
Europäisches Patentamt | 2024
|Folding type post-cast strip formwork and post-cast strip construction method
Europäisches Patentamt | 2024
|