Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
According to the green plant wall building, a green plant wall is integrated to a frame structure building, an eccentric beam is adopted for an outer wall part of a frame structure and located at the 1/2 position of the inner side of a column, a plate structure extends outwards by a certain distance out of a column side line, corresponding holes are formed in a side plate outside the beam according to the positions of through holes in the green plant wall, and holes are correspondingly formed in the corresponding positions of each layer of structure; a building top layer is provided with a parapet wall, the parapet wall is arranged on the outer side of the through hole, rainwater enters a green plant wall through the through hole after being collected on the top layer, is absorbed and stored by a water storage wall body and then is absorbed and utilized by plants, the green plant wall is improved to a certain degree, and the outer side of the water storage wall body is of a plastic frame structure. The building block type, splicing and plastic frame part structure goes deep into the water storage wall body and is fixed together through grouting or mortar filling to form an integral structure, and the bearing capacity and the stability of the building block type, splicing and plastic frame part structure are improved.
本发明公开了一种绿植墙建筑将绿植墙集成到框架结构建筑上,框架结构外墙部分采用偏心梁,位于柱子内侧1/2位置,板结构向外延伸出柱边线一段距离,在梁外一侧板上按照绿植墙内部贯通孔位置开对应孔,每层结构相应位置皆对应开孔,形成垂直方向上的贯通排水孔,建筑顶层设置女儿墙,女儿墙设置在贯通孔外侧,雨水在顶层汇集后,通过贯通孔进入绿植墙内部,被蓄水墙体吸收并储蓄起来,然后被植物吸收利用,对绿植墙做一定的改进,蓄水墙体外侧采用塑料框架结构,积木式,可拼装,塑料框架部分结构深入蓄水墙体中,通过注浆或填充砂浆固定在一起,形成一个整体性的结构,增加其承载力和稳定性。
According to the green plant wall building, a green plant wall is integrated to a frame structure building, an eccentric beam is adopted for an outer wall part of a frame structure and located at the 1/2 position of the inner side of a column, a plate structure extends outwards by a certain distance out of a column side line, corresponding holes are formed in a side plate outside the beam according to the positions of through holes in the green plant wall, and holes are correspondingly formed in the corresponding positions of each layer of structure; a building top layer is provided with a parapet wall, the parapet wall is arranged on the outer side of the through hole, rainwater enters a green plant wall through the through hole after being collected on the top layer, is absorbed and stored by a water storage wall body and then is absorbed and utilized by plants, the green plant wall is improved to a certain degree, and the outer side of the water storage wall body is of a plastic frame structure. The building block type, splicing and plastic frame part structure goes deep into the water storage wall body and is fixed together through grouting or mortar filling to form an integral structure, and the bearing capacity and the stability of the building block type, splicing and plastic frame part structure are improved.
本发明公开了一种绿植墙建筑将绿植墙集成到框架结构建筑上,框架结构外墙部分采用偏心梁,位于柱子内侧1/2位置,板结构向外延伸出柱边线一段距离,在梁外一侧板上按照绿植墙内部贯通孔位置开对应孔,每层结构相应位置皆对应开孔,形成垂直方向上的贯通排水孔,建筑顶层设置女儿墙,女儿墙设置在贯通孔外侧,雨水在顶层汇集后,通过贯通孔进入绿植墙内部,被蓄水墙体吸收并储蓄起来,然后被植物吸收利用,对绿植墙做一定的改进,蓄水墙体外侧采用塑料框架结构,积木式,可拼装,塑料框架部分结构深入蓄水墙体中,通过注浆或填充砂浆固定在一起,形成一个整体性的结构,增加其承载力和稳定性。
Green plant wall building
一种绿植墙建筑
WANG CHONGYING (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
Green plant building curtain wall and implementation method
Europäisches Patentamt | 2021
|Building glass curtain wall outer wall landscape green plant planting structure
Europäisches Patentamt | 2021
|