Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ancient building ridge purlin dismounting and replacing method
The invention provides an ancient building ridge purlin replacing method which comprises the following steps: manufacturing a new ridge purlin to be replaced according to an old ridge purlin on an ancient building; a ridge of the ancient building is overhung through a lever, and stress of an old ridge purlin is removed; releasing the fixation between the old ridge purlin and an upper rafter of the ancient building; corresponding to the old ridge purlin position, a gable brick masonry of the historic building is dismantled, and a hole is formed; the old ridge purlin is dismantled, and a new ridge purlin penetrates through the hole; and the hole in the gable is repaired, and the new ridge purlin is fixed. According to the scheme, the integrity and historical information of the main ridge of the ancient building are reserved, the cultural value of the main ridge of the ancient building is completely reserved, the operation method is simple and convenient, operation is easy, and the method is suitable for ancient building repairing projects of various scales and various environments and particularly suitable for Lingnan and Fujian ancient buildings with graceful ridges and with requirements for roofs.
本发明提供一种古建筑脊檩拆换方法,包括:根据古建筑上旧脊檩,制作待更换的新脊檩;利用杠杆将古建筑的屋脊悬挑,卸掉旧脊檩受力;解除旧脊檩与古建筑上椽子之间的固定;对应旧脊檩位置,拆除古建筑的山墙砖砌体,形成洞口;拆除旧脊檩,并从洞口穿入新脊檩;修复山墙上的洞口,对新脊檩进行固定。本方案保留了古建筑正脊的完整性和历史信息,较完整的保留了其文化价值,操作方法简便,易于操作,适用于各种规模、各种环境的古建筑修缮工程,特别适用于有优美屋脊的岭南、闽派对屋面要求的古建筑。
Ancient building ridge purlin dismounting and replacing method
The invention provides an ancient building ridge purlin replacing method which comprises the following steps: manufacturing a new ridge purlin to be replaced according to an old ridge purlin on an ancient building; a ridge of the ancient building is overhung through a lever, and stress of an old ridge purlin is removed; releasing the fixation between the old ridge purlin and an upper rafter of the ancient building; corresponding to the old ridge purlin position, a gable brick masonry of the historic building is dismantled, and a hole is formed; the old ridge purlin is dismantled, and a new ridge purlin penetrates through the hole; and the hole in the gable is repaired, and the new ridge purlin is fixed. According to the scheme, the integrity and historical information of the main ridge of the ancient building are reserved, the cultural value of the main ridge of the ancient building is completely reserved, the operation method is simple and convenient, operation is easy, and the method is suitable for ancient building repairing projects of various scales and various environments and particularly suitable for Lingnan and Fujian ancient buildings with graceful ridges and with requirements for roofs.
本发明提供一种古建筑脊檩拆换方法,包括:根据古建筑上旧脊檩,制作待更换的新脊檩;利用杠杆将古建筑的屋脊悬挑,卸掉旧脊檩受力;解除旧脊檩与古建筑上椽子之间的固定;对应旧脊檩位置,拆除古建筑的山墙砖砌体,形成洞口;拆除旧脊檩,并从洞口穿入新脊檩;修复山墙上的洞口,对新脊檩进行固定。本方案保留了古建筑正脊的完整性和历史信息,较完整的保留了其文化价值,操作方法简便,易于操作,适用于各种规模、各种环境的古建筑修缮工程,特别适用于有优美屋脊的岭南、闽派对屋面要求的古建筑。
Ancient building ridge purlin dismounting and replacing method
古建筑脊檩拆换方法
XU SONGFENG (Autor:in) / ZHANG PENG (Autor:in) / XU QING (Autor:in) / LIU HUANXIN (Autor:in) / ZHOU LIANG (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Purlin holder device for roof purlin installation, roof structure and purlin installation method
Europäisches Patentamt | 2022
|Multidirectional adjustable purlin hanger of steel structure roof purlin and mounting method
Europäisches Patentamt | 2023
|