Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Municipal sewage treatment water supply and drainage pipeline laying and mounting method
The invention discloses a municipal sewage treatment water supply and drainage pipeline laying and installing method. The installing method comprises the steps that S1, a foundation trench used for installing a pipeline is excavated in a preset installing position; s2, the previous section of pipeline is hoisted into the foundation trench and fixedly installed; s3, the next section of pipeline is hoisted into the foundation trench, an elastic water retaining ring is placed between the previous section of pipeline and the next section of pipeline, and then the next section of pipeline is connected with the previous section of pipeline through a connecting assembly; s4, the step S3 is repeated until the remaining pipelines are sequentially installed in the foundation trench in the length direction of the foundation trench; and S5, the foundation trench is backfilled with the slotted soil. The connecting structure has the effects of improving the connecting stability between the pipelines and reducing sewage leakage.
本发明公开了一种市政污水治理给排水管道敷设安装方法,其安装方法包括S1:在预定安装位置开挖用于安装管道的基槽;S2:将上一节的管道吊装至基槽内,并进行固定安装;S3:将下一节的管道吊装至基槽内,在上一节管道与下一节管道之间放置弹性挡水圈,再使用连接组件将下一节的管道与上一节的管道进行连接;S4:重复步骤S3,直至将余下的管道沿基槽长度方向依次安装在基槽内;S5:将开槽的泥土回填至基槽内。本申请具有提高管道之间连接稳定性,减少污水泄漏的效果。
Municipal sewage treatment water supply and drainage pipeline laying and mounting method
The invention discloses a municipal sewage treatment water supply and drainage pipeline laying and installing method. The installing method comprises the steps that S1, a foundation trench used for installing a pipeline is excavated in a preset installing position; s2, the previous section of pipeline is hoisted into the foundation trench and fixedly installed; s3, the next section of pipeline is hoisted into the foundation trench, an elastic water retaining ring is placed between the previous section of pipeline and the next section of pipeline, and then the next section of pipeline is connected with the previous section of pipeline through a connecting assembly; s4, the step S3 is repeated until the remaining pipelines are sequentially installed in the foundation trench in the length direction of the foundation trench; and S5, the foundation trench is backfilled with the slotted soil. The connecting structure has the effects of improving the connecting stability between the pipelines and reducing sewage leakage.
本发明公开了一种市政污水治理给排水管道敷设安装方法,其安装方法包括S1:在预定安装位置开挖用于安装管道的基槽;S2:将上一节的管道吊装至基槽内,并进行固定安装;S3:将下一节的管道吊装至基槽内,在上一节管道与下一节管道之间放置弹性挡水圈,再使用连接组件将下一节的管道与上一节的管道进行连接;S4:重复步骤S3,直至将余下的管道沿基槽长度方向依次安装在基槽内;S5:将开槽的泥土回填至基槽内。本申请具有提高管道之间连接稳定性,减少污水泄漏的效果。
Municipal sewage treatment water supply and drainage pipeline laying and mounting method
一种市政污水治理给排水管道敷设安装方法
LI XIAOBIN (Autor:in) / LI WEI (Autor:in) / ZHUANG XIANJUN (Autor:in) / LI XIAODONG (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
Drainage pipeline laying construction method for sewage treatment
Europäisches Patentamt | 2021
|Municipal sewage treatment drainage pipeline connecting device
Europäisches Patentamt | 2024
|Municipal concrete drainage pipeline laying construction method
Europäisches Patentamt | 2020
|