Nested steel pipe pile and construction method for nested steel pipe pile
The embodiment of the invention provides a nested steel pipe pile and a construction method for the nested steel pipe pile. The nested steel pipe pile comprises a steel pipe pile body, a clamping groove structure is fixed to the inner wall of the steel pipe pile body, the inner diameter of the steel pipe pile body is larger than the outer diameter of an old steel pipe pile, and the clamping groove structure is used for being clamped to a main lifting lug of the old steel pipe pile. The method comprises the steps that a first steel pipe pile is annularly cut; a pile stabilizing platform is built around the first steel pipe piles; positioning, feeding and piling the second steel pipe pile according to the piling mother ship and the pile stabilizing platform until the clamping groove structure on the inner wall of the second steel pipe pile is clamped on the main lifting lug of the first steel pipe pile; wherein the second steel pipe pile is the nested steel pipe pile. The nested steel pipe pile can be connected to the outer layer of the old steel pipe pile in a sleeving mode, and the problem that the old steel pipe pile is difficult to renovate or replace is solved.
本申请实施例提供嵌套式钢管桩以及用于嵌套式钢管桩的施工方法。该嵌套式钢管桩包括:包括钢管桩本体,钢管桩本体内壁上固定有卡槽结构,钢管桩本体的内径大于旧钢管桩的外径,卡槽结构用于卡接在旧钢管桩的主吊耳上。该方法包括:对第一钢管桩进行环切;围绕第一钢管桩搭建稳桩平台;根据打桩母船和稳桩平台对第二钢管桩进行定位、喂桩、打桩直至第二钢管桩内壁上的卡槽结构卡接在第一钢管桩的主吊耳上;其中,第二钢管桩为上述嵌套式钢管桩。本申请能够将嵌套式钢管桩套接在旧钢管桩外层,解决旧钢管桩难以翻新或者更换的问题。
Nested steel pipe pile and construction method for nested steel pipe pile
The embodiment of the invention provides a nested steel pipe pile and a construction method for the nested steel pipe pile. The nested steel pipe pile comprises a steel pipe pile body, a clamping groove structure is fixed to the inner wall of the steel pipe pile body, the inner diameter of the steel pipe pile body is larger than the outer diameter of an old steel pipe pile, and the clamping groove structure is used for being clamped to a main lifting lug of the old steel pipe pile. The method comprises the steps that a first steel pipe pile is annularly cut; a pile stabilizing platform is built around the first steel pipe piles; positioning, feeding and piling the second steel pipe pile according to the piling mother ship and the pile stabilizing platform until the clamping groove structure on the inner wall of the second steel pipe pile is clamped on the main lifting lug of the first steel pipe pile; wherein the second steel pipe pile is the nested steel pipe pile. The nested steel pipe pile can be connected to the outer layer of the old steel pipe pile in a sleeving mode, and the problem that the old steel pipe pile is difficult to renovate or replace is solved.
本申请实施例提供嵌套式钢管桩以及用于嵌套式钢管桩的施工方法。该嵌套式钢管桩包括:包括钢管桩本体,钢管桩本体内壁上固定有卡槽结构,钢管桩本体的内径大于旧钢管桩的外径,卡槽结构用于卡接在旧钢管桩的主吊耳上。该方法包括:对第一钢管桩进行环切;围绕第一钢管桩搭建稳桩平台;根据打桩母船和稳桩平台对第二钢管桩进行定位、喂桩、打桩直至第二钢管桩内壁上的卡槽结构卡接在第一钢管桩的主吊耳上;其中,第二钢管桩为上述嵌套式钢管桩。本申请能够将嵌套式钢管桩套接在旧钢管桩外层,解决旧钢管桩难以翻新或者更换的问题。
Nested steel pipe pile and construction method for nested steel pipe pile
嵌套式钢管桩以及用于嵌套式钢管桩的施工方法
CHEN LEI (Autor:in) / JIA XIAOHUI (Autor:in) / HUANG JIASHENG (Autor:in) / JIANG HAO (Autor:in) / ZHU JIANJUN (Autor:in) / JIN FENGXUE (Autor:in) / LI XINGGUO (Autor:in) / GU YANLIANG (Autor:in) / HUANGFU ZEYU (Autor:in) / HU YONGHUA (Autor:in)
03.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Grouting device of steel pipe nested pile and construction method
Europäisches Patentamt | 2024
|STEEL PIPE PILE JOINT, STEEL PIPE PILE, AND CONSTRUCTION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2021
|Steel-pipe pile and steel-pipe pile construction method
Europäisches Patentamt | 2016
|CONSTRUCTION METHOD FOR STEEL PIPE PILE AND STEEL PIPE PILE
Europäisches Patentamt | 2022
|STEEL PIPE PILE AND CONSTRUCTION METHOD FOR STEEL PIPE PILE
Europäisches Patentamt | 2020
|