Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intelligent pile foundation construction method, device, equipment and medium under complex soft foundation condition
The invention relates to the technical field of foundation treatment, in particular to a pile foundation intelligent construction method, device and equipment under the complex soft foundation condition and a medium. The method comprises the steps that accurate coordinates corresponding to each pile hole are obtained, a corresponding moving instruction is generated, it is ensured that the drilling machine can accurately move to the position of each pile hole, then movement and initial construction work of the drilling machine are automatically controlled, the complexity and uncertainty of manual operation are reduced, and the construction efficiency is improved. In the drilling machine construction process, the pile foundation information corresponding to the target pile hole coordinates is obtained in real time, the pile foundation information comprises key parameters such as the drill rod inclination rate and perpendicularity, the labor cost is reduced, the safety risk caused by improper manual operation is reduced, once it is found that the pile foundation information does not meet the pile position error range, measures can be taken immediately for adjustment, and the work efficiency is improved. For example, the position, angle or construction parameters of a drilling machine are adjusted, and the stability and reliability of construction quality are ensured.
本申请涉及地基处理技术领域,尤其是涉及一种复杂软基地况下桩基智能化施工方法、装置、设备及介质。方法包括:通过获取每个桩孔对应的精确坐标,并生成对应的移动指令,确保钻机能够准确无误地移动到每个桩孔位置,然后通过自动化控制钻机的移动和初始施工工作,减少了人工操作的繁琐和不确定性,提高了施工效率。在钻机施工过程中,实时获取目标桩孔坐标对应的桩基信息,包括钻杆倾斜率和垂直度等关键参数,降低了人工成本,并减少了因人工操作不当导致的安全风险,一旦发现桩基信息不满足桩位误差范围,可以立即采取措施进行调整,如调整钻机的位置、角度或施工参数等,确保了施工质量的稳定性和可靠性。
Intelligent pile foundation construction method, device, equipment and medium under complex soft foundation condition
The invention relates to the technical field of foundation treatment, in particular to a pile foundation intelligent construction method, device and equipment under the complex soft foundation condition and a medium. The method comprises the steps that accurate coordinates corresponding to each pile hole are obtained, a corresponding moving instruction is generated, it is ensured that the drilling machine can accurately move to the position of each pile hole, then movement and initial construction work of the drilling machine are automatically controlled, the complexity and uncertainty of manual operation are reduced, and the construction efficiency is improved. In the drilling machine construction process, the pile foundation information corresponding to the target pile hole coordinates is obtained in real time, the pile foundation information comprises key parameters such as the drill rod inclination rate and perpendicularity, the labor cost is reduced, the safety risk caused by improper manual operation is reduced, once it is found that the pile foundation information does not meet the pile position error range, measures can be taken immediately for adjustment, and the work efficiency is improved. For example, the position, angle or construction parameters of a drilling machine are adjusted, and the stability and reliability of construction quality are ensured.
本申请涉及地基处理技术领域,尤其是涉及一种复杂软基地况下桩基智能化施工方法、装置、设备及介质。方法包括:通过获取每个桩孔对应的精确坐标,并生成对应的移动指令,确保钻机能够准确无误地移动到每个桩孔位置,然后通过自动化控制钻机的移动和初始施工工作,减少了人工操作的繁琐和不确定性,提高了施工效率。在钻机施工过程中,实时获取目标桩孔坐标对应的桩基信息,包括钻杆倾斜率和垂直度等关键参数,降低了人工成本,并减少了因人工操作不当导致的安全风险,一旦发现桩基信息不满足桩位误差范围,可以立即采取措施进行调整,如调整钻机的位置、角度或施工参数等,确保了施工质量的稳定性和可靠性。
Intelligent pile foundation construction method, device, equipment and medium under complex soft foundation condition
复杂软基地况下桩基智能化施工方法、装置、设备及介质
SHI QINGJUN (Autor:in) / HU GUANGMIN (Autor:in) / WANG YONG (Autor:in) / LIU LIN (Autor:in) / LIU MINGGONG (Autor:in)
06.12.2024
Patent
Elektronische Ressource
Chinesisch
Pile foundation pile repairing construction technology under existing pile foundation condition
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2015
|Prestressed static pressure pile construction method under soft soil foundation condition
Europäisches Patentamt | 2024
|Pile foundation equipment applied to complex foundation and pile forming construction method
Europäisches Patentamt | 2024
|Construction method of soft soil foundation pile foundation
Europäisches Patentamt | 2021
|