Fabricated concrete frame beam structure and construction method
The invention discloses a fabricated concrete frame beam structure and a construction method, and aims to overcome the defects that a large number of pure concrete frame structures exist in industrial buildings, cast-in-place concrete construction is generally adopted, the formwork construction workload is large, and the construction period is long. The structure comprises existing frame columns and prefabricated frame beams, the prefabricated frame beams are erected on the existing frame columns, cast-in-place concrete is arranged at the upper ends of the existing frame columns, and the prefabricated frame beams and the existing frame columns are poured into a whole through the cast-in-place concrete. According to the fabricated concrete frame beam structure, the number of the formwork supports is greatly reduced, the workload of the formwork supports is reduced, the construction period is shortened, and the purpose that the fabricated structure is convenient to construct is achieved.
本发明公开了一种装配式混凝土框架梁结构及施工方法,旨在解决工业建筑存在大量的纯混凝土框架结构,通常采用现浇混凝土施工,具有模板施工工作量大、施工周期长的不足。该发明包括既有框架柱和预制框架梁,预制框架梁搭设在既有框架柱上,既有框架柱上端设置现浇混凝土,现浇混凝土将预制框架梁和既有框架柱浇筑成一个整体。本专利申请的装配式混凝土框架梁结构大大减少了模板支撑数量,减小了模板支撑的工作量,缩短了施工周期,实现了装配式结构施工便捷性的目标。
Fabricated concrete frame beam structure and construction method
The invention discloses a fabricated concrete frame beam structure and a construction method, and aims to overcome the defects that a large number of pure concrete frame structures exist in industrial buildings, cast-in-place concrete construction is generally adopted, the formwork construction workload is large, and the construction period is long. The structure comprises existing frame columns and prefabricated frame beams, the prefabricated frame beams are erected on the existing frame columns, cast-in-place concrete is arranged at the upper ends of the existing frame columns, and the prefabricated frame beams and the existing frame columns are poured into a whole through the cast-in-place concrete. According to the fabricated concrete frame beam structure, the number of the formwork supports is greatly reduced, the workload of the formwork supports is reduced, the construction period is shortened, and the purpose that the fabricated structure is convenient to construct is achieved.
本发明公开了一种装配式混凝土框架梁结构及施工方法,旨在解决工业建筑存在大量的纯混凝土框架结构,通常采用现浇混凝土施工,具有模板施工工作量大、施工周期长的不足。该发明包括既有框架柱和预制框架梁,预制框架梁搭设在既有框架柱上,既有框架柱上端设置现浇混凝土,现浇混凝土将预制框架梁和既有框架柱浇筑成一个整体。本专利申请的装配式混凝土框架梁结构大大减少了模板支撑数量,减小了模板支撑的工作量,缩短了施工周期,实现了装配式结构施工便捷性的目标。
Fabricated concrete frame beam structure and construction method
一种装配式混凝土框架梁结构及施工方法
WANG ZHILEI (Autor:in) / ZHU JIAN (Autor:in) / WU MENG (Autor:in) / WANG XUEMIN (Autor:in) / SHAO HUA (Autor:in) / PAN YU (Autor:in) / LIU JIAMING (Autor:in) / FEI XIONGJUN (Autor:in) / YIN GANG (Autor:in)
06.12.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated reinforced concrete frame structure beam assembly joint and construction method
Europäisches Patentamt | 2023
|Fabricated concrete frame joint structure and construction method
Europäisches Patentamt | 2023
|Fabricated concrete frame structure farm house construction method
Europäisches Patentamt | 2023
|Fabricated concrete frame structure and construction method thereof
Europäisches Patentamt | 2022
|Construction method of reinforced concrete fabricated frame structure
Europäisches Patentamt | 2024
|