Stone dry hanging joint and construction method thereof
The invention provides a stone dry-hanging joint and a construction method thereof. The stone dry-hanging joint comprises a transverse keel profile, a vertical keel profile, a first connecting corner connector, a first fixing bolt, a first adjusting bolt, a first adjusting nut, a second adjusting nut, a second adjusting bolt, a first hanging piece and a first connecting piece. A movable adjusting opening is formed in one side of the vertical keel profile; the first connecting corner connector is connected with the transverse keel profile through a first fixing bolt; the first connecting corner connector is connected with a first adjusting bolt through a first adjusting nut, and the first adjusting bolt is in sliding connection with the movable adjusting opening; a first movable sliding groove is formed in the transverse keel profile, and the first connecting piece is connected with the second adjusting bolt through the second adjusting nut. The second adjusting bolt is in sliding connection with the first movable sliding groove. A first back bolt is arranged on the first hanging piece and connected with the stone in an inserted mode. And the side, away from the stone, of the first hanging piece is connected with the first connecting piece in a clamped mode, so that the problem that a user cannot conveniently adjust the position of the keel is solved.
本申请提供一种石材干挂节点及其施工方法,石材干挂节点包括横向龙骨型材、竖向龙骨型材、第一连接角码、第一固定螺栓、第一调节螺栓、第一调节螺母、第二调节螺母、第二调节螺栓、第一挂件和第一连接件;竖向龙骨型材一侧开设有活动调节口;第一连接角码通过第一固定螺栓与横向龙骨型材连接;第一连接角码通过第一调节螺母与第一调节螺栓连接,第一调节螺栓与活动调节口滑动连接;横向龙骨型材开设有第一活动滑槽,第一连接件通过第二调节螺母与第二调节螺栓连接;第二调节螺栓与第一活动滑槽滑动连接;第一挂件上设有第一背栓,第一背栓与石材插接;第一挂件远离石材的一侧与第一连接件卡接,以解决不便于使用者对龙骨的位置进行调节的问题。
Stone dry hanging joint and construction method thereof
The invention provides a stone dry-hanging joint and a construction method thereof. The stone dry-hanging joint comprises a transverse keel profile, a vertical keel profile, a first connecting corner connector, a first fixing bolt, a first adjusting bolt, a first adjusting nut, a second adjusting nut, a second adjusting bolt, a first hanging piece and a first connecting piece. A movable adjusting opening is formed in one side of the vertical keel profile; the first connecting corner connector is connected with the transverse keel profile through a first fixing bolt; the first connecting corner connector is connected with a first adjusting bolt through a first adjusting nut, and the first adjusting bolt is in sliding connection with the movable adjusting opening; a first movable sliding groove is formed in the transverse keel profile, and the first connecting piece is connected with the second adjusting bolt through the second adjusting nut. The second adjusting bolt is in sliding connection with the first movable sliding groove. A first back bolt is arranged on the first hanging piece and connected with the stone in an inserted mode. And the side, away from the stone, of the first hanging piece is connected with the first connecting piece in a clamped mode, so that the problem that a user cannot conveniently adjust the position of the keel is solved.
本申请提供一种石材干挂节点及其施工方法,石材干挂节点包括横向龙骨型材、竖向龙骨型材、第一连接角码、第一固定螺栓、第一调节螺栓、第一调节螺母、第二调节螺母、第二调节螺栓、第一挂件和第一连接件;竖向龙骨型材一侧开设有活动调节口;第一连接角码通过第一固定螺栓与横向龙骨型材连接;第一连接角码通过第一调节螺母与第一调节螺栓连接,第一调节螺栓与活动调节口滑动连接;横向龙骨型材开设有第一活动滑槽,第一连接件通过第二调节螺母与第二调节螺栓连接;第二调节螺栓与第一活动滑槽滑动连接;第一挂件上设有第一背栓,第一背栓与石材插接;第一挂件远离石材的一侧与第一连接件卡接,以解决不便于使用者对龙骨的位置进行调节的问题。
Stone dry hanging joint and construction method thereof
石材干挂节点及其施工方法
ZHOU XIAOBIN (Autor:in) / GAO LINGBAO (Autor:in)
10.12.2024
Patent
Elektronische Ressource
Chinesisch
Stone dry hanging structure and stone dry hanging construction method
Europäisches Patentamt | 2021
|Stone dry hanging structure and stone dry hanging construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Stone dry-hanging fixing structure and stone dry-hanging rapid construction method
Europäisches Patentamt | 2024
|