Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method and device for restraining deformation of roadbed in permafrost region
The invention relates to a roadbed deformation inhibition method and device for a frozen soil region, and the method comprises the following steps: carrying out the geological exploration of the frozen soil region, and obtaining the exploration data; determining an ice melting scheme according to the survey data; according to the ice melting scheme, water heat transfer between the road area of the frozen soil area and other areas is blocked; heating the ice layer of the road area of the frozen soil area to melt the ice layer; water generated by melting the ice layer is drained through the drainage mechanism; a gravel hardcore is matched with an impact rolling mode in a road area of a frozen soil area, and a compact soil layer roadbed is obtained. Compared with the prior art, the method has the advantages of high stability, high construction quality and the like.
本发明涉及一种用于冻土区的路基变形抑制的方法和装置,方法包括以下步骤:对冻土区进行地质勘查,得到勘察数据;根据勘察数据确定融冰方案;根据融冰方案,阻隔冻土区的道路用地区与其他区域之间的水热传递;对冻土区的道路用地区的冰层进行加热,融化冰层;通过排水机构排出融化冰层产生的水;对冻土区的道路用地区使用碎石垫层配合冲击碾压的方式,得到密实土层路基。与现有技术相比,本发明具有稳定性强、施工质量高等优点。
Method and device for restraining deformation of roadbed in permafrost region
The invention relates to a roadbed deformation inhibition method and device for a frozen soil region, and the method comprises the following steps: carrying out the geological exploration of the frozen soil region, and obtaining the exploration data; determining an ice melting scheme according to the survey data; according to the ice melting scheme, water heat transfer between the road area of the frozen soil area and other areas is blocked; heating the ice layer of the road area of the frozen soil area to melt the ice layer; water generated by melting the ice layer is drained through the drainage mechanism; a gravel hardcore is matched with an impact rolling mode in a road area of a frozen soil area, and a compact soil layer roadbed is obtained. Compared with the prior art, the method has the advantages of high stability, high construction quality and the like.
本发明涉及一种用于冻土区的路基变形抑制的方法和装置,方法包括以下步骤:对冻土区进行地质勘查,得到勘察数据;根据勘察数据确定融冰方案;根据融冰方案,阻隔冻土区的道路用地区与其他区域之间的水热传递;对冻土区的道路用地区的冰层进行加热,融化冰层;通过排水机构排出融化冰层产生的水;对冻土区的道路用地区使用碎石垫层配合冲击碾压的方式,得到密实土层路基。与现有技术相比,本发明具有稳定性强、施工质量高等优点。
Method and device for restraining deformation of roadbed in permafrost region
一种用于冻土区的路基变形抑制的方法和装置
QIAN JINSONG (Autor:in) / JIANG ZHONGKAI (Autor:in) / ZHANG YU (Autor:in) / LIU HAIYANG (Autor:in) / CHEN ZHENG (Autor:in) / ZHANG HAIHU (Autor:in)
13.12.2024
Patent
Elektronische Ressource
Chinesisch
Roadbed construction method for permafrost region and roadbed
Europäisches Patentamt | 2024
|Railway permafrost region roadbed deformation detection and prediction system
Europäisches Patentamt | 2020
|Permafrost region roadbed thermal insulation construction method
Europäisches Patentamt | 2016
|Hydrothermal protection roadbed structure in permafrost region
Europäisches Patentamt | 2022
|Cooling roadbed structure for permafrost region and construction method
Europäisches Patentamt | 2024
|