Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction integration platform
The invention discloses a construction integration platform which comprises a supporting power system, a supporting power system, a supporting power system, a supporting power system and a supporting power system, and the supporting power system is used for being installed on a constructed shell; the platform system comprises a vertical frame, a first bearing platform and a second bearing platform, the first bearing platform and the second bearing platform are arranged at the top end of the vertical frame and extend out of the two sides of the vertical frame, and the bearing power system is connected with the vertical frame and used for driving the platform system to ascend and descend. The inner hanging frame is mounted at one end of the first bearing platform; the outer hanging frame is installed on the second bearing platform, the outer hanging frame and the inner hanging frame are arranged in a spaced mode, and the top of the outer hanging frame is flush with the top of the inner hanging frame. According to the construction integration platform, equal-elevation synchronous construction can be conducted on the inner shell and the outer shell from the inner hanging frame and the outer hanging frame, the workshop construction progress is accelerated, and the construction efficiency is improved.
本申请公开了一种施工集成平台,包括:支承动力系统,支承动力系统用于安装于已施工的外壳上;平台系统,平台系统包括立架和立架顶端设置的第一承载平台和第二承载平台,第一承载平台和第二承载平台在立架的两侧伸出,支承动力系统与立架连接,支承动力系统用于驱动平台系统升降;内挂架,内挂架安装于第一承载平台的一端;外挂架,外挂架安装于第二承载平台,外挂架和内挂架间隔设置,外挂架和内挂架的顶部平齐。本申请施工集成平台可以从内挂架和外挂架对内壳和外壳等标高同步施工,加快了厂房施工进程,提高了施工效率。
Construction integration platform
The invention discloses a construction integration platform which comprises a supporting power system, a supporting power system, a supporting power system, a supporting power system and a supporting power system, and the supporting power system is used for being installed on a constructed shell; the platform system comprises a vertical frame, a first bearing platform and a second bearing platform, the first bearing platform and the second bearing platform are arranged at the top end of the vertical frame and extend out of the two sides of the vertical frame, and the bearing power system is connected with the vertical frame and used for driving the platform system to ascend and descend. The inner hanging frame is mounted at one end of the first bearing platform; the outer hanging frame is installed on the second bearing platform, the outer hanging frame and the inner hanging frame are arranged in a spaced mode, and the top of the outer hanging frame is flush with the top of the inner hanging frame. According to the construction integration platform, equal-elevation synchronous construction can be conducted on the inner shell and the outer shell from the inner hanging frame and the outer hanging frame, the workshop construction progress is accelerated, and the construction efficiency is improved.
本申请公开了一种施工集成平台,包括:支承动力系统,支承动力系统用于安装于已施工的外壳上;平台系统,平台系统包括立架和立架顶端设置的第一承载平台和第二承载平台,第一承载平台和第二承载平台在立架的两侧伸出,支承动力系统与立架连接,支承动力系统用于驱动平台系统升降;内挂架,内挂架安装于第一承载平台的一端;外挂架,外挂架安装于第二承载平台,外挂架和内挂架间隔设置,外挂架和内挂架的顶部平齐。本申请施工集成平台可以从内挂架和外挂架对内壳和外壳等标高同步施工,加快了厂房施工进程,提高了施工效率。
Construction integration platform
施工集成平台
WANG KAIQIANG (Autor:in) / SUN QING (Autor:in) / LIU WEI (Autor:in) / HUANG LEI (Autor:in) / YANG KANG (Autor:in)
13.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Open caisson construction equipment integration platform
Europäisches Patentamt | 2024
|Intelligent construction integration platform and use method
Europäisches Patentamt | 2023
|Construction integration platform system applied to high-rise building and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|