Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pouring trolley
The invention relates to the technical field of pouring, in particular to a pouring trolley which comprises an outer mold mechanism, an inner mold mechanism and an outer mold mechanism. The inner mold mechanism comprises a second walking assembly and an inner mold assembly. When the outer mold assembly is located at the first pouring position and the inner mold assembly is located at the second pouring position, a pouring cavity is defined by the end plug plate, the outer mold assembly and the inner mold assembly. According to the embodiment of the invention, by arranging the outer mold mechanism and the inner mold mechanism, free switching can be automatically carried out from the pouring position to the walking position, so that position fixing can be automatically realized at the pouring position, a traditional pull rod fixing mode is not needed, and the wall body construction quality is improved. Moreover, after pouring is finished, dismantling is not needed, and the device is dragged to the next pouring construction through the corresponding walking assembly, so that the construction efficiency is greatly improved, and meanwhile, the operation steps of technicians are simplified.
本发明涉及浇筑技术领域,具体涉及一种浇筑台车,该浇筑台车包括:外模机构,包括外模桁架、第一行走组件以及外模组件;内模机构包括第二行走组件以及内模组件;在所述外模组件处于所述第一浇筑位置以及所述内模组件处于所述第二浇筑位置时,所述端头堵板、所述外模组件与所述内模组件包围形成浇筑腔。本发明实施例通过设置外模机构和内模机构,可以自动从浇筑位置到行走位置进行自由切换,因此在浇筑位置可以自动实现位置固定,无需采用传统对拉杆的固定方式,从而提高了墙身施工质量。并且,在浇筑结束之后,无需进行拆除,通过对应的行走组件拖动到下一个浇筑施工为止即可,从而大大提升了施工效率,同时简化了技术人员的操作步骤。
Pouring trolley
The invention relates to the technical field of pouring, in particular to a pouring trolley which comprises an outer mold mechanism, an inner mold mechanism and an outer mold mechanism. The inner mold mechanism comprises a second walking assembly and an inner mold assembly. When the outer mold assembly is located at the first pouring position and the inner mold assembly is located at the second pouring position, a pouring cavity is defined by the end plug plate, the outer mold assembly and the inner mold assembly. According to the embodiment of the invention, by arranging the outer mold mechanism and the inner mold mechanism, free switching can be automatically carried out from the pouring position to the walking position, so that position fixing can be automatically realized at the pouring position, a traditional pull rod fixing mode is not needed, and the wall body construction quality is improved. Moreover, after pouring is finished, dismantling is not needed, and the device is dragged to the next pouring construction through the corresponding walking assembly, so that the construction efficiency is greatly improved, and meanwhile, the operation steps of technicians are simplified.
本发明涉及浇筑技术领域,具体涉及一种浇筑台车,该浇筑台车包括:外模机构,包括外模桁架、第一行走组件以及外模组件;内模机构包括第二行走组件以及内模组件;在所述外模组件处于所述第一浇筑位置以及所述内模组件处于所述第二浇筑位置时,所述端头堵板、所述外模组件与所述内模组件包围形成浇筑腔。本发明实施例通过设置外模机构和内模机构,可以自动从浇筑位置到行走位置进行自由切换,因此在浇筑位置可以自动实现位置固定,无需采用传统对拉杆的固定方式,从而提高了墙身施工质量。并且,在浇筑结束之后,无需进行拆除,通过对应的行走组件拖动到下一个浇筑施工为止即可,从而大大提升了施工效率,同时简化了技术人员的操作步骤。
Pouring trolley
浇筑台车
WANG KAIXIANG (Autor:in) / GONG LIANG (Autor:in) / YAN SHUAI (Autor:in) / ZHANG MENG (Autor:in) / TANG KUNHAN (Autor:in) / LU JING (Autor:in) / YAO NAN (Autor:in) / MA ZHICHAO (Autor:in) / WANG ZHIPENG (Autor:in) / ZHAO ZILONG (Autor:in)
13.12.2024
Patent
Elektronische Ressource
Chinesisch
Wet joint concrete secondary stirring pouring trolley system
Europäisches Patentamt | 2021
|Externally-connected pouring trolley for concrete pump truck
Europäisches Patentamt | 2016
|Large-span thin-wall concrete sound barrier pouring trolley
Europäisches Patentamt | 2021
|Formwork trolley for box culvert pouring and control method
Europäisches Patentamt | 2024
|Concrete rectangular inclined column pouring mold trolley and construction method thereof
Europäisches Patentamt | 2024
|