Construction method of breast wall of semi-vertical breakwater
The invention relates to the technical field of breakwater construction, in particular to a construction method of a breast wall of a semi-vertical breakwater, which comprises the following steps: S1, using land equipment to fill a first block stone on the top of a caisson from the breakwater root to the breakwater head to the open sea side of the caisson to form a breakwater core structure; s2, using land equipment to fill second block stones to the top of the caisson and the top of the breakwater core structure from the breakwater root to the breakwater head to form a construction road; s3, the land equipment is used for sequentially digging out the second block stones corresponding to the tops of the caissons in the direction from the breakwater head to the breakwater root of the breakwater; and S4, concrete is poured on the top of the caisson to form breast wall sections, and all the breast wall sections are sequentially poured in the direction from the breakwater head to the breakwater root of the breakwater to form a breast wall. The construction shortcut is built on the top of the caisson, it can be guaranteed that pouring of each breast wall can be conducted through the construction shortcut by means of land construction equipment, a workboat does not need to be used, the rental cost of the workboat can be saved, and the operation cost is reduced.
本发明涉及防波堤施工技术领域,具体涉及一种半直立式防波堤的胸墙的施工方法,包括:S1:使用陆上设备在沉箱的顶部从防波堤的堤根朝堤头方向堆填第一块石到沉箱的外海侧以形成堤心结构;S2:使用陆上设备从防波堤的堤根朝堤头方向堆填第二块石到沉箱的顶部及堤心结构的顶部以形成施工便道;S3:使用陆上设备从防波堤的堤头朝堤根方向依次挖除每个沉箱的顶部对应的第二块石;S4:在沉箱顶部浇筑混凝土形成胸墙段,从防波堤的堤头朝堤根方向依次浇筑每段胸墙段以形成胸墙。本发明通过在沉箱顶部修建施工便道可保证每段胸墙的浇筑都可以利用陆上施工设备通过施工便道来进行作业,无需使用施工船,可省去施工船的租赁费用,降低作业成本。
Construction method of breast wall of semi-vertical breakwater
The invention relates to the technical field of breakwater construction, in particular to a construction method of a breast wall of a semi-vertical breakwater, which comprises the following steps: S1, using land equipment to fill a first block stone on the top of a caisson from the breakwater root to the breakwater head to the open sea side of the caisson to form a breakwater core structure; s2, using land equipment to fill second block stones to the top of the caisson and the top of the breakwater core structure from the breakwater root to the breakwater head to form a construction road; s3, the land equipment is used for sequentially digging out the second block stones corresponding to the tops of the caissons in the direction from the breakwater head to the breakwater root of the breakwater; and S4, concrete is poured on the top of the caisson to form breast wall sections, and all the breast wall sections are sequentially poured in the direction from the breakwater head to the breakwater root of the breakwater to form a breast wall. The construction shortcut is built on the top of the caisson, it can be guaranteed that pouring of each breast wall can be conducted through the construction shortcut by means of land construction equipment, a workboat does not need to be used, the rental cost of the workboat can be saved, and the operation cost is reduced.
本发明涉及防波堤施工技术领域,具体涉及一种半直立式防波堤的胸墙的施工方法,包括:S1:使用陆上设备在沉箱的顶部从防波堤的堤根朝堤头方向堆填第一块石到沉箱的外海侧以形成堤心结构;S2:使用陆上设备从防波堤的堤根朝堤头方向堆填第二块石到沉箱的顶部及堤心结构的顶部以形成施工便道;S3:使用陆上设备从防波堤的堤头朝堤根方向依次挖除每个沉箱的顶部对应的第二块石;S4:在沉箱顶部浇筑混凝土形成胸墙段,从防波堤的堤头朝堤根方向依次浇筑每段胸墙段以形成胸墙。本发明通过在沉箱顶部修建施工便道可保证每段胸墙的浇筑都可以利用陆上施工设备通过施工便道来进行作业,无需使用施工船,可省去施工船的租赁费用,降低作业成本。
Construction method of breast wall of semi-vertical breakwater
一种半直立式防波堤的胸墙的施工方法
CHEN JIAN (Autor:in) / LUO PING (Autor:in) / DENG SHANGKANG (Autor:in) / HUANG SHI (Autor:in) / YUAN GUIYOU (Autor:in) / WU JUNHUA (Autor:in) / MA ZHITAO (Autor:in) / CHENG ENHAO (Autor:in) / LI XIAO'EN (Autor:in)
17.12.2024
Patent
Elektronische Ressource
Chinesisch