Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Column top supporting tool for mounting prefabricated floor system and mounting method of column top supporting tool
The invention relates to a column top supporting tool for prefabricated floor installation and an installation method thereof.The supporting tool is installed on a stand column and comprises a leveling bearing piece, a leveling locking screw rod, a main beam bracket, a main locking screw rod, a secondary beam bracket and a locking bolt; the installation method comprises the following steps that 1, the leveling bearing piece is clamped on the stand column; step 2, supporting a main beam bracket on a corresponding leveling bearing piece, and tightly attaching the main beam bracket to the upright post; 3, secondary beam brackets are supported on the main supporting rib plates on the corresponding sides correspondingly; 4, the main beam is supported on the main beam bracket, then the secondary beam is supported on the secondary beam bracket, and concrete is poured at the beam-column joint; 5, after the leveling bearing piece is moved downwards by 5-10 mm, the leveling bearing piece is clamped on the stand column again; and 6, after the locking bolt and the main locking screw rod are dismounted, the secondary beam bracket and the main beam bracket are taken in sequence. And 7, the leveling bearing piece is dismantled. The device has the advantages of being accurate in positioning and convenient to disassemble and assemble.
本发明为一种预制楼盖安装用柱顶支撑工装及其安装方法,支撑工装安装于立柱上,包括调平承托件、调平锁定螺杆、主梁牛腿、主锁定螺杆、次梁牛腿以及锁定螺栓;其安装方法包括如下步骤,步骤1,将调平承托件夹持于立柱上;步骤2,主梁牛腿支承于对应调平承托件上,将主梁牛腿紧贴于立柱上;步骤3,将次梁牛腿分别支承于对应侧的主支撑肋板上;步骤4,将主梁支承于主梁牛腿,再将次梁支承于次梁牛腿,在梁柱节点处浇筑混凝土;步骤5,将调平承托件下移5‑10mm后,将调平承托件再次夹持于立柱上;步骤6,拆除锁定螺栓和主锁定螺杆后先后取下次梁牛腿和主梁牛腿。步骤7,拆除调平承托件。本发明具有定位准确、拆装方便的特点。
Column top supporting tool for mounting prefabricated floor system and mounting method of column top supporting tool
The invention relates to a column top supporting tool for prefabricated floor installation and an installation method thereof.The supporting tool is installed on a stand column and comprises a leveling bearing piece, a leveling locking screw rod, a main beam bracket, a main locking screw rod, a secondary beam bracket and a locking bolt; the installation method comprises the following steps that 1, the leveling bearing piece is clamped on the stand column; step 2, supporting a main beam bracket on a corresponding leveling bearing piece, and tightly attaching the main beam bracket to the upright post; 3, secondary beam brackets are supported on the main supporting rib plates on the corresponding sides correspondingly; 4, the main beam is supported on the main beam bracket, then the secondary beam is supported on the secondary beam bracket, and concrete is poured at the beam-column joint; 5, after the leveling bearing piece is moved downwards by 5-10 mm, the leveling bearing piece is clamped on the stand column again; and 6, after the locking bolt and the main locking screw rod are dismounted, the secondary beam bracket and the main beam bracket are taken in sequence. And 7, the leveling bearing piece is dismantled. The device has the advantages of being accurate in positioning and convenient to disassemble and assemble.
本发明为一种预制楼盖安装用柱顶支撑工装及其安装方法,支撑工装安装于立柱上,包括调平承托件、调平锁定螺杆、主梁牛腿、主锁定螺杆、次梁牛腿以及锁定螺栓;其安装方法包括如下步骤,步骤1,将调平承托件夹持于立柱上;步骤2,主梁牛腿支承于对应调平承托件上,将主梁牛腿紧贴于立柱上;步骤3,将次梁牛腿分别支承于对应侧的主支撑肋板上;步骤4,将主梁支承于主梁牛腿,再将次梁支承于次梁牛腿,在梁柱节点处浇筑混凝土;步骤5,将调平承托件下移5‑10mm后,将调平承托件再次夹持于立柱上;步骤6,拆除锁定螺栓和主锁定螺杆后先后取下次梁牛腿和主梁牛腿。步骤7,拆除调平承托件。本发明具有定位准确、拆装方便的特点。
Column top supporting tool for mounting prefabricated floor system and mounting method of column top supporting tool
预制楼盖安装用柱顶支撑工装及其安装方法
REN YU (Autor:in) / LI LIANGCHENG (Autor:in) / CHEN YINYI (Autor:in)
17.12.2024
Patent
Elektronische Ressource
Chinesisch
Tool and method for positioning and mounting prefabricated column
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|