Construction method for crack resistance of plateau tunnel lining concrete
The invention belongs to the technical field of tunnel construction, and relates to a construction method for crack resistance of plateau tunnel lining concrete, which comprises the following steps: S1, screening of concrete raw materials: screening all raw materials according to the requirements of crack resistance of plateau tunnel lining concrete and the following requirements; s2, according to the anti-cracking performance requirement of the plateau tunnel lining concrete, the raw materials screened in the step S1 are adopted, and anti-cracking concrete is formed according to the set mixing proportion; s3, preparation before concrete pouring; s4, the concrete is put into a mold, poured and vibrated; and S5, concrete curing. According to the method, the concrete mixing proportion is designed, the concrete is poured in a mold, and the vibration and curing temperature and humidity in the concrete pouring process are controlled, so that the concrete shrinkage rate is reduced, and the anti-cracking performance of the concrete is improved.
本发明属于隧道施工技术领域,涉及一种用于高原隧道衬砌混凝土抗裂的施工方法,包括以下步骤:S1、混凝土原材料筛选:根据高原隧道衬砌混凝土抗裂性能要求,按照以下要求筛选各个原材料;S2、根据高原隧道衬砌混凝土抗裂性能要求,采用步骤S1筛选的原材料并按照设定的配合比形成抗裂混凝土;S3、混凝土浇筑前准备;S4、混凝土入模、浇筑、振捣;S5、混凝土养护。本发明通过设计混凝土配合比、混凝土入模浇筑、控制混凝土浇筑中振捣及养护温湿度,使得混凝土收缩率降低,提高混凝土的抗裂性能。
Construction method for crack resistance of plateau tunnel lining concrete
The invention belongs to the technical field of tunnel construction, and relates to a construction method for crack resistance of plateau tunnel lining concrete, which comprises the following steps: S1, screening of concrete raw materials: screening all raw materials according to the requirements of crack resistance of plateau tunnel lining concrete and the following requirements; s2, according to the anti-cracking performance requirement of the plateau tunnel lining concrete, the raw materials screened in the step S1 are adopted, and anti-cracking concrete is formed according to the set mixing proportion; s3, preparation before concrete pouring; s4, the concrete is put into a mold, poured and vibrated; and S5, concrete curing. According to the method, the concrete mixing proportion is designed, the concrete is poured in a mold, and the vibration and curing temperature and humidity in the concrete pouring process are controlled, so that the concrete shrinkage rate is reduced, and the anti-cracking performance of the concrete is improved.
本发明属于隧道施工技术领域,涉及一种用于高原隧道衬砌混凝土抗裂的施工方法,包括以下步骤:S1、混凝土原材料筛选:根据高原隧道衬砌混凝土抗裂性能要求,按照以下要求筛选各个原材料;S2、根据高原隧道衬砌混凝土抗裂性能要求,采用步骤S1筛选的原材料并按照设定的配合比形成抗裂混凝土;S3、混凝土浇筑前准备;S4、混凝土入模、浇筑、振捣;S5、混凝土养护。本发明通过设计混凝土配合比、混凝土入模浇筑、控制混凝土浇筑中振捣及养护温湿度,使得混凝土收缩率降低,提高混凝土的抗裂性能。
Construction method for crack resistance of plateau tunnel lining concrete
一种用于高原隧道衬砌混凝土抗裂的施工方法
WANG SHUAISHUAI (Autor:in) / MIAO LONGGANG (Autor:in) / XU YONG (Autor:in) / GUO YABIN (Autor:in) / GAO XUAN (Autor:in)
17.12.2024
Patent
Elektronische Ressource
Chinesisch
TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
Europäisches Patentamt | 2017
|CONSTRUCTION METHOD OF TUNNEL LINING CONCRETE AND ADHESION INHIBITOR FOR TUNNEL LINING CONCRETE
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF TUNNEL LINING AND FORM FOR TUNNEL LINING CONCRETE
Europäisches Patentamt | 2019
|