Combination structure of prefabricated prestressed beam body and cast-in-place beam
The invention discloses a prefabricated prestressed beam body and cast-in-place beam combined structure which comprises two prestressed beam bodies, and a steel frame is installed between the two prestressed beam bodies through a first connecting assembly. Two side steel plates and a second connecting assembly are arranged between the two prestressed beam bodies; the two side steel plates are connected with the steel frame through third connecting assemblies. The prestressed beam bodies, the first connecting assemblies, the steel frames, the second connecting assemblies and the third connecting assemblies are arranged to be matched with one another, the steel frames are directly and fixedly installed between the two prestressed beam bodies through the first connecting assemblies, and the steel frames are matched with the arranged side steel plates, so that a frame structure of the cast-in-place beam can be built; in the construction process, ground supporting equipment does not need to be erected for use, during grouting, the steel frame and the steel plate are firmly combined with the prestressed beam body through cooperation of the first connecting assembly, the second connecting assembly and the third connecting assembly, and operation is easy and convenient.
本发明公开了一种预制预应力梁本体与现浇梁的结合结构,包括两预应力梁本体,两所述预应力梁本体之间通过第一连接组件安装有钢框;两所述预应力梁本体之间设置有两侧钢板以及第二连接组件;两所述侧钢板均通过第三连接组件与钢框连接。本发明通过设置预应力梁本体、第一连接组件、钢框、第二连接组件、第三连接组件之间的相互配合,钢框通过第一连接组件直接固定安装在两个预应力梁本体之间,并配合设置的侧钢板,可以搭建出一个现浇梁的框架结构,搭建的过程中不需要再搭设地面支撑设备即可进行使用,灌浆时,钢框以及钢板通过第一连接组件、第二连接组件以及第三连接组件的配合与预应力梁本体牢固结合,操作起来简单方便。
Combination structure of prefabricated prestressed beam body and cast-in-place beam
The invention discloses a prefabricated prestressed beam body and cast-in-place beam combined structure which comprises two prestressed beam bodies, and a steel frame is installed between the two prestressed beam bodies through a first connecting assembly. Two side steel plates and a second connecting assembly are arranged between the two prestressed beam bodies; the two side steel plates are connected with the steel frame through third connecting assemblies. The prestressed beam bodies, the first connecting assemblies, the steel frames, the second connecting assemblies and the third connecting assemblies are arranged to be matched with one another, the steel frames are directly and fixedly installed between the two prestressed beam bodies through the first connecting assemblies, and the steel frames are matched with the arranged side steel plates, so that a frame structure of the cast-in-place beam can be built; in the construction process, ground supporting equipment does not need to be erected for use, during grouting, the steel frame and the steel plate are firmly combined with the prestressed beam body through cooperation of the first connecting assembly, the second connecting assembly and the third connecting assembly, and operation is easy and convenient.
本发明公开了一种预制预应力梁本体与现浇梁的结合结构,包括两预应力梁本体,两所述预应力梁本体之间通过第一连接组件安装有钢框;两所述预应力梁本体之间设置有两侧钢板以及第二连接组件;两所述侧钢板均通过第三连接组件与钢框连接。本发明通过设置预应力梁本体、第一连接组件、钢框、第二连接组件、第三连接组件之间的相互配合,钢框通过第一连接组件直接固定安装在两个预应力梁本体之间,并配合设置的侧钢板,可以搭建出一个现浇梁的框架结构,搭建的过程中不需要再搭设地面支撑设备即可进行使用,灌浆时,钢框以及钢板通过第一连接组件、第二连接组件以及第三连接组件的配合与预应力梁本体牢固结合,操作起来简单方便。
Combination structure of prefabricated prestressed beam body and cast-in-place beam
一种预制预应力梁本体与现浇梁的结合结构
HU ZHIBIAO (Autor:in) / XIA WEI (Autor:in) / ZHANG DEFA (Autor:in) / ZHUANG QIANJIA (Autor:in)
20.12.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Cast-in-place beam prestressed pipeline mounting device
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Prestressed concrete prefabricated assembly type pier cover beam structure
Europäisches Patentamt | 2024
|