Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a novel metal structure building construction design and manufacturing construction scheme. The novel metal structure building construction design and manufacturing construction scheme comprises a metal node component, a metal column component, a metal beam component, a metal plate component and a metal foundation component, and the metal plate component further comprises a metal plate covering the top face of the metal plate component, a plate main beam and a plate secondary beam. The metal frame is constructed by adopting a method of firstly assembling component bolts, then welding and then removing process parts. The metal components are subjected to tailor-welding, subtractive machining and precise machining of assembly matching surfaces. The metal plate component is completed through the method that hoisting, positioning, cutting, secondary hoisting, tailor welding and finally hoisting process part removing are carried out.
本发明公开了一种新型一种新型金属结构建筑构造设计及制造施工方案,包括金属节点构件、金属柱构件、金属梁构件、金属板构件、金属基础构件,其中金属板构件又包括金属板构件顶面覆盖金属板、板主梁、板次梁。金属框架采用先将构件螺栓装配组装再焊接再去除工艺件的方法施工。金属构件均采用先拼焊再减材加工,精密加工装配配合面的方法。金属板构件采用先吊装后定位后剪裁后二次吊装后拼焊最后去除吊装工艺件的方法完成。
The invention discloses a novel metal structure building construction design and manufacturing construction scheme. The novel metal structure building construction design and manufacturing construction scheme comprises a metal node component, a metal column component, a metal beam component, a metal plate component and a metal foundation component, and the metal plate component further comprises a metal plate covering the top face of the metal plate component, a plate main beam and a plate secondary beam. The metal frame is constructed by adopting a method of firstly assembling component bolts, then welding and then removing process parts. The metal components are subjected to tailor-welding, subtractive machining and precise machining of assembly matching surfaces. The metal plate component is completed through the method that hoisting, positioning, cutting, secondary hoisting, tailor welding and finally hoisting process part removing are carried out.
本发明公开了一种新型一种新型金属结构建筑构造设计及制造施工方案,包括金属节点构件、金属柱构件、金属梁构件、金属板构件、金属基础构件,其中金属板构件又包括金属板构件顶面覆盖金属板、板主梁、板次梁。金属框架采用先将构件螺栓装配组装再焊接再去除工艺件的方法施工。金属构件均采用先拼焊再减材加工,精密加工装配配合面的方法。金属板构件采用先吊装后定位后剪裁后二次吊装后拼焊最后去除吊装工艺件的方法完成。
Novel metal structure building construction design and manufacturing construction scheme
一种新型金属结构建筑构造设计及制造施工方案
SONG JIAN (Autor:in)
20.12.2024
Patent
Elektronische Ressource
Chinesisch
Novel deformation joint building construction structure and construction method
Europäisches Patentamt | 2024
|Building construction structure and building construction method
Europäisches Patentamt | 2024
|Building construction structure and building construction method
Europäisches Patentamt | 2023
|Novel exhibition hall building construction structure
Europäisches Patentamt | 2021
|