Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Precise construction process for pipeline integrated reserved hole wall part
The invention relates to the technical field of pipeline wall penetration, in particular to a precise construction process of a pipeline integrated reserved hole wall component, which comprises the following construction steps of preparation before operation, mold customization, block forming and mounting, pipeline insertion and wall maintenance. According to the precise construction technology for the pipeline integrated reserved hole wall part, the quality of the pipeline penetrating through the wall can be further improved, and damage to a building is avoided.
本申请涉及管道穿墙的技术领域,尤其是涉及管道一体化预留洞口墙体部件精准施工工艺,包括如下施工步骤:作业前准备、定制模具、成型安装块体、插入管道、墙体养护。本申请提供管道一体化预留洞口墙体部件精准施工工艺,能够进一步提高管道穿墙时的质量,免于对建筑物造成损坏。
Precise construction process for pipeline integrated reserved hole wall part
The invention relates to the technical field of pipeline wall penetration, in particular to a precise construction process of a pipeline integrated reserved hole wall component, which comprises the following construction steps of preparation before operation, mold customization, block forming and mounting, pipeline insertion and wall maintenance. According to the precise construction technology for the pipeline integrated reserved hole wall part, the quality of the pipeline penetrating through the wall can be further improved, and damage to a building is avoided.
本申请涉及管道穿墙的技术领域,尤其是涉及管道一体化预留洞口墙体部件精准施工工艺,包括如下施工步骤:作业前准备、定制模具、成型安装块体、插入管道、墙体养护。本申请提供管道一体化预留洞口墙体部件精准施工工艺,能够进一步提高管道穿墙时的质量,免于对建筑物造成损坏。
Precise construction process for pipeline integrated reserved hole wall part
管道一体化预留洞口墙体部件精准施工工艺
HONG DONGMING (Autor:in) / CHEN YUZHOU (Autor:in) / YE ZHANPENG (Autor:in) / DENG ZHIWEN (Autor:in) / LI HUIJIAO (Autor:in) / CHEN YIQIAO (Autor:in) / LIU GUOGE (Autor:in) / ZHANG CHUNHUI (Autor:in) / LIANG JUN (Autor:in) / XIE JUN (Autor:in)
20.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Pipeline reserved hole plugging mold and construction method
Europäisches Patentamt | 2021
|Shear wall reserved hole blocking construction device
Europäisches Patentamt | 2023
|Precise positioning mold for reserved hole and construction method
Europäisches Patentamt | 2024
|Floor pipeline reserved hole plugging formwork and construction method
Europäisches Patentamt | 2021
|Concrete for construction engineering drainage pipeline reserved hole plugging
Europäisches Patentamt | 2015
|